CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF GUINTUBHAN BRIDGE) ALONG BINALBAGAN-ISABELA ROAD, NEGROS OCCIDENTAL (LEFT BANK)
CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF GUINTUBHAN BRIDGE) ALONG BINALBAGAN-ISABELA ROAD, NEGROS OCCIDENTAL (LEFT BANK) is a DPWH-tracked public work in Negros Occidental 2nd DEO, Negros Island Region. Reported contract value: ₱55,969,782.29. Status: Reported complete (DPWH). Contractor on record: JAIME B CHING ENT. Figures trace to dpwh.
Total Contract Cost

