Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 20 (Ekip), Bokod, Benguet
Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Section 20 (Ekip), Bokod, Benguet is a DPWH-tracked public work in BOKOD (BENGUET), BENGUET, Cordillera Administrative Region. Reported contract value: ₱23,765,066.81. Status: Reported complete (DPWH). Contractor on record: CLIFF CONST & AGGREGATES. Figures trace to sumbong.
Total Contract Cost

