Flood Control and Drainage24JI0113

REPAIR/RECONSTRUCTION OF DAMAGED FLOOD CONTROL STRUCTURE ALONG SIBUGUEY RIVER, BARANGAY PARADISE, DIPLAHAN, ZAMBOANGA SIBUGAY - STA. 00+000 - 00+117.50

REPAIR/RECONSTRUCTION OF DAMAGED FLOOD CONTROL STRUCTURE ALONG SIBUGUEY RIVER, BARANGAY PARADISE, DIPLAHAN, ZAMBOANGA SIBUGAY - STA. 00+000 - 00+117.50 is a DPWH-tracked public work in Zamboanga Sibugay 1st DEO, Region IX. Reported contract value: ₱18,930,750.12. Status: Past target date (DPWH On-Going). Contractor on record: BADSBRO CONST AND GEN MERCHANDISE. Figures trace to dpwh.

Zamboanga Sibugay 1st DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱40,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24JI0113 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    60% reported · imagery 2019-12-18 → 2024-12-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱161,113 per linear m= 1.5x the Region IX median (n=26)

Contract cost ₱18,930,750 ÷ 117.5 linear m read from the DPWH title (“STA. 00+000 - 00+117.50”; station range length (Sta. a+b to c+d)). National percentile: 66. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Zamboanga Sibugay

Based on the coordinates published with the DPWH record and NOAH file ZamboangaSibugay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR/RECONSTRUCTION OF DAMAGED FLOOD CONTROL STRUCTURE ALONG SIBUGUEY RIVER, BARANGAY PARADISE, DIPLAHAN, ZAMBOANGA SIBUGAY - STA. 00+000 - 00+117.50

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Sibuguey River, Barangay Lumpanac, Imelda, Zamboanga Sibugay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Zamboanga Sibugay 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

245 projects · ₱12.0B total · 1 flags

4. Implementation

Contract Amount

₱18,930,750.12

Progress

Past target date (DPWH On-Going)

Start Date

August 30, 2024

Target End

April 10, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga SibugayDiplahanParadise
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.