REPAIR OF VARIOUS FLOOD CONTROL PROJECTS 1.REPAIR OF BARAMBAN CREEK FLOOD CONTROL STRUCTURE AT BRGY. SOTERO-NUESA, ROXAS, ISABELA 2.REPAIR OF SIFFU RIVER FLOOD CONTROL STRUCTURE AT BRGY. LUCBAN, ROXAS, ISABELA
REPAIR OF VARIOUS FLOOD CONTROL PROJECTS 1.REPAIR OF BARAMBAN CREEK FLOOD CONTROL STRUCTURE AT BRGY. SOTERO-NUESA, ROXAS, ISABELA 2.REPAIR OF SIFFU RIVER FLOOD CONTROL STRUCTURE AT BRGY. LUCBAN, ROXAS, ISABELA is a DPWH-tracked public work in Isabela 2nd DEO, Region II. Reported contract value: ₱9,452,737.61. Status: Reported complete (DPWH). Contractor on record: D S T METALCRAFT AND ENGINEERING WORKS 34382. Figures trace to dpwh.
Total Contract Cost
