FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAAG RIVER, DOWNSTREAM BAAG BRIDGE, PAGUDPUD, ILOCOS NORTE
FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAAG RIVER, DOWNSTREAM BAAG BRIDGE, PAGUDPUD, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱47,271,746.65. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: JLP CONST. Figures trace to dpwh.
Total Contract Cost
