GAA 2025 OO-125A00189

CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 6)

CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 6) is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱93,615,599.47. Status: Past target date (DPWH On-Going). Contractor on record: SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC. Figures trace to dpwh.

Region I, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

68 projects · ₱2.6B total · 8 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0614+524-K0614+604

Cagayan 2nd DEO, Region II

2021₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0590+(-030)-K0590+(-10), K0590+100-K0590+20

Cagayan 2nd DEO, Region II

2021₱96.5M
Reported complete (DPWH)

Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan

CLAVERIA (CAGAYAN), CAGAYAN, Region II

2023₱84.0M
Reported complete (DPWH)
No sat.

Construction of Cabicungan Flood Control Structure along Cabicungan River,Centro 6-Dibalio, Claveria, Cagayan

CLAVERIA (CAGAYAN), CAGAYAN, Region II

2023₱77.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS-TERTIARY ROADS-JCT. LOGAC-LASAM-GAGABUTAN ROAD-CHAINAGE 17288-CHAINAGE 17408, CHAINAGE 17656-CHAINAGE 20581, CHAINAGE 20994-CHAINAGE 21138, RIZAL, CAGAYAN

Cagayan 2nd DEO, Region II

2019₱76.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN, DINGRIS RIVER, LEFT BANK, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2023₱75.3M
Reported complete (100% progress, DPWH status On-Going)
View all 68 projects →

4. Implementation

Contract Amount

₱93,615,599.47

Progress

Past target date (DPWH On-Going)

Start Date

February 21, 2025

Target End

November 22, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.