SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 68 linked DPWH project(s) totaling about ₱2,578,826,807.30. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 68
- Total value
- ₱2,578,826,807.30
- Published flags
- 8
- Region
- Cagayan 2nd DEO · Region II
Public Record Grade
A transparent, data-derived summary of reported public records for SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 72.00 / 100 · Projects in sample: 68 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 41.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 41.9
- lateCompletedProjects
- 20
- onTimeCompletedProjects
- 26
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 66
- pastTargetOngoingProjects
- 20
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 68
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 68
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.7/100 · Weight: 11%
- projects
- 68
- componentScore
- 98.7
- flagsPerProject
- 0.04
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 68
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 67 geotagged projects (largest by contract value) — Open full map
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0590+(-030)-K0590+(-10), K0590+100-K0590+2021BC0071 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0614+524-K0614+60421BC0081 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 6)25A00189 · ₱93,615,599.47 · mapped
- Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan23BC0022 · ₱83,950,800.00 · mapped
- Construction of Cabicungan Flood Control Structure along Cabicungan River,Centro 6-Dibalio, Claveria, Cagayan23BC0080 · ₱77,200,000.00 · mapped
- NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS-TERTIARY ROADS-JCT. LOGAC-LASAM-GAGABUTAN ROAD-CHAINAGE 17288-CHAINAGE 17408, CHAINAGE 17656-CHAINAGE 20581, CHAINAGE 20994-CHAINAGE 21138, RIZAL, CAGAYAN19BC0168 · ₱76,609,420.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN, DINGRIS RIVER, LEFT BANK, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE23AA0120 · ₱75,259,593.11 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION/IMPROVEMENT OF PAOAY LAKE (PAOAY LAKE NATIONAL PARK) PAOAY, ILOCOS NORTE23A00094 · ₱74,883,979.51 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MANILA NORTH RD-K0640+1007-K0644+019, PAMPLONA, CAGAYAN22BC0003 · ₱72,572,825.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MANILA NORTH RD-K0625+000-K0628+061, SANCHEZ MIRA, CAGAYAN22BC0002 · ₱72,375,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF CABICUNGAN FLOOD CONTROL PROJECT ALONG CABICUNGAN RIVER (SAN ANTONIO-KAPANNIKIAN-TABBUGAN SECTION), CLAVERIA, CAGAYAN19BC0064 · ₱71,972,595.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. AYAGA (ABULUG)-BALLESTEROS-APARRI RD - K0674+241-K0677+366, K0681+000-K0682+34524BC0079 · ₱71,289,305.84 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROAD-CLAVERIA BYPASS ROAD, CLAVERIA, CAGAYAN19BC0169 · ₱69,126,450.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN, GUISIT RIVER, SITIO SALAGUID, BARANGAY ABUCAY, PIDDIG, ILOCOS NORTE23AA0122 · ₱65,853,511.46 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - PRIMARY ROADS MANILA NORTH ROAD - KO654+322-KO655+042, KO655+066-KO655+388, KO655+411-KO655+57921BC0038 · ₱58,272,220.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MANILA NORTH RD-K0615+000-K0617+198, CLAVERIA, CAGAYAN22BC0001 · ₱54,108,515.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CABICUNGAN RIVER FLOOD CONTROL AT SAN ANTONIO-CAPANIKIAN-TABBUGAN, CLAVERIA, CAGAYAN18BC0002 · ₱53,075,000.00 · mapped
- Construction of Masi Flood Control Structure along Pamplona River (Sta. 0+000 - Sta. 0+250), Pamplona, Cagayan22BC0028 · ₱49,000,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF LUCBAN FLOOD CONTROL STRUCTURE ALONG ABULUG RIVER, STA. 0+996-STA. 1+196(R/S), ABULUG, CAGAYAN21BC0063 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: CLAVERIA BYPASS ROAD, CAGAYAN20BC0011 · ₱48,670,840.00 · mapped
- Construction of Cabicungan Flood Control Structure along Cabicungan River, Capanikkian-Nagsabaran, Claveria, Cagayan23BC0021 · ₱48,250,000.00 · mapped
- Construction of Flood Control Structure along Guron River, Brgy. Cadcadir, Claveria, Cagayan23BC0024 · ₱48,250,000.00 · mapped
- Construction of Flood Mitigation Structures along Cabicungan River, Tabbugan, Claveria, Cagayan23BC0025 · ₱48,250,000.00 · mapped
- Construction of Flood Control Structure along Cadcadir River, Brgy. Bacsay Cataraoan Sur, Claveria, Cagayan23BC0023 · ₱48,250,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MANILA NORTH RD- K0628 + 061 - K0629 + 952, SANCHEZ MIRA, CAGAYAN23BC0002 · ₱48,018,741.08 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF POBLACION DRAINAGE SYSTEM, CLAVERIA, CAGAYAN23BC0157 · ₱47,924,248.56 · mapped
- CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, CLAVERIA (CAGAYAN)-NAGSABARAN-STA. FILOMENA (APAYAO) ROAD,23BC0055 · ₱47,748,870.00 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-MANILA NORTH RD - K0590 + (-422) - K0590 + (-379), K0590 + (-322) - K0590 + (-289), K0590 + (-144) - K0590 + (-110), K0590 + (-80) - K0590 + (-058), K0590 + 348 - K0590 + 3718BC0092 · ₱47,395,225.19 · mapped
- RESTORATION OF SLOPE PROTECTION ALONG MANILA NORTH ROAD, SAN JUAN, STA. PRAXEDES, CAGAYAN20BC0222 · ₱46,742,670.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CABICUNGAN FLOOD CONTROL STRUCTURE ALONG CABICUNGAN RIVER, SAN ANTONIO-CAPANNIKIAN-TABBUGAN, CLAVERIA, CAGAYAN20BC0024 · ₱44,100,000.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-MANILA NORTH RD- K0607+000- K0608+40818BC0011 · ₱42,558,050.52 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH RD-K0679+272-K0679+762, BALLESTEROS, CAGAYAN22BC0007 · ₱40,876,735.07 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALAMBEG CIS RIVER BANK PROTECTION L/S, PIDDIG, ILOCOS NORTE24AA0110 · ₱38,758,043.29 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MANILA NORTH RD-K0647+000-K0648+565, PAMPLONA, CAGAYAN22BC0004 · ₱38,617,880.00 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-ALLACAPAN BYPASS ROAD AT ALLACAPAN, CAGAYAN19BC0063 · ₱36,998,150.00 · mapped
- Construction of Pata Flood Control Structure along Pata River (Sta. 0+000 - Sta. 0+120), Pata, Claveria,Cagayan22BC0029 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: CLAVERIA BYPASS ROAD, CAGAYAN20BC0195 · ₱28,841,119.05 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SABO DAM, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE25AA0152 · ₱28,402,450.40 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANGITAYAG, PIDDIG, ILOCOS NORTE25AA0493 · ₱28,221,751.65 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY LIBNAOAN, PIDDIG, ILOCOS NORTE25AA0492 · ₱28,213,326.71 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE25AA0488 · ₱28,209,862.51 · mapped
- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -REHAB. OF FLOOD MITIGATION STRUCTURE - RESTORATION OF TAGUNTUNGAN RIVER CONTROL, STA. 0+149 - STA. 000+438, STA. MARGARITA, BAGGAO, CAGAYAN18BB0070 · ₱25,612,155.50 · mapped
- CONST. OF FLOOD CONTROL STRUCTURES ALONG BONGO RIVER, BRGY. SAN MARCOS, SARRAT, ILOCOS NORTE18AA0227 · ₱23,729,133.24 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BONGO RIVER, BRGY. POBLACION, MUNICIPALITY OF SARRAT, ILOCOS NORTE18AA0244 · ₱23,271,499.31 · mapped
- Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan22BC0119 · ₱19,600,000.00 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LIBNAOAN FLOOD CONTROL, PIDDIG, ILOCOS NORTE24AA0100 · ₱19,599,920.43 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANGITAYAG FLOOD CONTROL, PIDDIG, ILOCOS NORTE24AA0102 · ₱19,599,835.60 · mapped
- CONCRETING OFBRGY. ABUCAY FMR, BRGY. ABUCAY, PIDDIG, ILOCOS NORTE24AA0442 · ₱19,098,344.75 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - LAOAG-SARRAT-PIDDIG-SOLSOLNA RD - K0505+250 - K0505+44024AA0036 · ₱19,005,826.07 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADSLEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) -TANGAOAN-PALLAS ROAD LEADING TO PARAISOECOTOURISM PROJECT ECO AND REFORESTATIONPROJECT, PIDDIG, ILOCOS NORTE24AA0328 · ₱18,823,565.08 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
