CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF LUCBAN FLOOD CONTROL STRUCTURE ALONG ABULUG RIVER, STA. 0+996-STA. 1+196(R/S), ABULUG, CAGAYAN
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF LUCBAN FLOOD CONTROL STRUCTURE ALONG ABULUG RIVER, STA. 0+996-STA. 1+196(R/S), ABULUG, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC. Figures trace to dpwh.
Total Contract Cost

