Construction of Flood Mitigation Structure23BC0022

Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan

Construction of Cabicungan Flood Control Structure along Cabicungan River, Nagsabaran, Claveria, Cagayan is a DPWH-tracked public work in CLAVERIA (CAGAYAN), CAGAYAN, Region II. Reported contract value: ₱83,950,800.00. Status: Reported complete (DPWH). Contractor on record: SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC. Figures trace to sumbong.

CLAVERIA (CAGAYAN), CAGAYAN, Region II
Region: Region II

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Pata Flood Control Structure along Pata River, Pata, Claveria, Cagayan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cagayan 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

68 projects · ₱2.6B total · 8 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0590+(-030)-K0590+(-10), K0590+100-K0590+20

Cagayan 2nd DEO, Region II

2021₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0614+524-K0614+604

Cagayan 2nd DEO, Region II

2021₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 6)

Region I, Region I

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

Construction of Cabicungan Flood Control Structure along Cabicungan River,Centro 6-Dibalio, Claveria, Cagayan

CLAVERIA (CAGAYAN), CAGAYAN, Region II

2023₱77.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS-TERTIARY ROADS-JCT. LOGAC-LASAM-GAGABUTAN ROAD-CHAINAGE 17288-CHAINAGE 17408, CHAINAGE 17656-CHAINAGE 20581, CHAINAGE 20994-CHAINAGE 21138, RIZAL, CAGAYAN

Cagayan 2nd DEO, Region II

2019₱76.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN, DINGRIS RIVER, LEFT BANK, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2023₱75.3M
Reported complete (100% progress, DPWH status On-Going)
View all 68 projects →

4. Implementation

Contract Amount

₱83,950,800.00

Progress

Reported complete (DPWH)

Start Date

February 6, 2023

Target End

November 26, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.