Roads24AA0328

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADSLEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) -TANGAOAN-PALLAS ROAD LEADING TO PARAISOECOTOURISM PROJECT ECO AND REFORESTATIONPROJECT, PIDDIG, ILOCOS NORTE

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADSLEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) -TANGAOAN-PALLAS ROAD LEADING TO PARAISOECOTOURISM PROJECT ECO AND REFORESTATIONPROJECT, PIDDIG, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱18,823,565.08. Status: Past target date (DPWH On-Going). Contractor on record: SKYLINE CONST EQUIPMENT AND DEVELOPMENT CORP FORMERLY: EDDIE G GUILLEN BUILDERS INC 14174. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cabaroan Flood Control, Piddig, Ilocos Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 14174

59 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0590+(-030)-K0590+(-10), K0590+100-K0590+20

Cagayan 2nd DEO, Region II

2021₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-MANILA NORTH RD-K0614+524-K0614+604

Cagayan 2nd DEO, Region II

2021₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/ NEW ROADS PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 6)

Region I, Region I

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS-TERTIARY ROADS-JCT. LOGAC-LASAM-GAGABUTAN ROAD-CHAINAGE 17288-CHAINAGE 17408, CHAINAGE 17656-CHAINAGE 20581, CHAINAGE 20994-CHAINAGE 21138, RIZAL, CAGAYAN

Cagayan 2nd DEO, Region II

2019₱76.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN, DINGRIS RIVER, LEFT BANK, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2023₱75.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION/IMPROVEMENT OF PAOAY LAKE (PAOAY LAKE NATIONAL PARK) PAOAY, ILOCOS NORTE

Region I, Region I

2023₱74.9M
Past target date (DPWH On-Going)
View all 59 projects →

4. Implementation

Contract Amount

₱18,823,565.08

Progress

Past target date (DPWH On-Going)

Start Date

May 23, 2024

Target End

December 8, 2024

5. Audit