CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PONOT DIUT RIVER (DOWNSTREAM) BOTH SIDES, JOSE DALMAN, ZAMBOANGA DEL NORTE
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PONOT DIUT RIVER (DOWNSTREAM) BOTH SIDES, JOSE DALMAN, ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱99,132,312.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: MONTAÑO CONST & DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost


