Flood Control and Drainage20BD0079

LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF DRAINAGE SYSTEM ALONG GUNNACAO STREET, CATAGGAMAN NUEVO, TUGUEGARA

LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF DRAINAGE SYSTEM ALONG GUNNACAO STREET, CATAGGAMAN NUEVO, TUGUEGARA is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱19,045,824.18. Status: Reported complete (DPWH). Contractor on record: RPF CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱62,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20BD0079 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-04 → 2025-06-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Cagayan

Based on the coordinates published with the DPWH record and NOAH file Cagayan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS - CONSTRUCTION OF DRAINAGE SYSTEM ALONG GUNNACAO STREET, CATAGGAMAN NUEVO, TUGUEGARA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱62,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Natappian Flood Control System, Sta. 0+930 - Sta. 1+130, Solana, Cagayan (Downstream)
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Cagayan 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

56 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS; ALCALA-STO. NIÑO-LASAM ROAD, CAGAYAN, CAGAYAN-PACKAGE 2, CAGAYAN

Region II, Region II

2023₱113.3M
Past target date (DPWH On-Going)
No sat.

CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD LEADING TO CONVENTION/EXPO AND SPORTS CENTER, DIORA ZINUGAN, STA. ANA, CAGAYAN

Cagayan 1st DEO, Region II

2022₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS - N1; ROAD WIDENING - JCT. LOGAC-MAGAPIT ROAD - K0708+580 - K0711+633.40 BARANGAY ALAGUIA TO BARANGAY MAGAPIT, LAL-LO, CAGAYAN (S00688LZ)

Cagayan 1st DEO, Region II

2017₱91.2M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- ALCALA-STO. NIÑO- LASAM ROAD

Region II, Region II

2022₱85.6M
Reported complete (DPWH)
No sat.

CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS -CONST. OF FLOOD MITIGATION STRUCTURE- CONST. OF FLOOD CONTROL SYSTEM, STA. 0+000 - STA. 0+348 (DOWNSTREAM), BRGY. CASICALLAN NORTE & AGUIGUICAN, GATTARAN, CAGAYAN

Cagayan 1st DEO, Region II

2018₱66.9M
Reported complete (DPWH)
No sat.

Construction of Drainage System along Caritan- Balzain Creek Sta.0+(-280) - Sta. 0+(-689.20), Caritan, Tuguegarao City, Cagayan

TUGUEGARAO CITY (CAPITAL) (CAGAYAN), CAGAYAN, Region II

2022₱57.9M
Reported complete (DPWH)
View all 56 projects →

4. Implementation

Contract Amount

₱19,045,824.18

Progress

Reported complete (DPWH)

Start Date

November 23, 2020

Target End

August 9, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanTuguegarao CityCataggaman Nuevo
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.