Roads25FM0023

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAN FERNANDO - SAN JACINTO - MONREAL ROAD, MASBATE.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAN FERNANDO - SAN JACINTO - MONREAL ROAD, MASBATE. is a DPWH-tracked public work in Masbate 1st DEO, Region V. Reported contract value: ₱33,268,499.90. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: JIMWELL BUILDERS AND SUPPLIES CORP FORMERLY:JIMWELL BUILDERS. Figures trace to dpwh.

Masbate 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱27,362 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25FM0023 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-05-25 → 2025-11-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAN FERNANDO - SAN JACINTO - MONREAL ROAD, MASBATE.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱27,362,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Barangay Rizal, Batuan, Masbate
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Masbate 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

24 projects · ₱624.8M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - MASBATE - MILAGROS RD (S00015MT), K0006+580 - K0007+255), CITY OF MASBATE, MASBATE

Masbate 2nd DEO, Region V

2025₱49.9M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE

Masbate 1st DEO, Region V

2024₱48.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD, TACDUGAN TO SITIO PANDONG, BARANGAY STA. ROSA, SAN JACINTO, MASBATE.

Masbate 1st DEO, Region V

2025₱46.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-SAN FERNANDO NORTH ROAD-K0016+573-K0016+789,K0018+ 598-K0018+935,K0019+000-K0019+097,K0019+198-K0019+ 284,K0019+726-K0019+816,K0021+182-K0021+244

Masbate 1st DEO, Region V

2024₱40.5M
Reported complete (DPWH)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BUENAVISTA RIVER, BARANGAY MAGSAYSAY, USON, MASBATE

Masbate 3rd DEO, Region V

2025₱39.4M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, MASBATE- CATAINGAN- PLACER RD- K0029+180- K0030+000

Masbate 3rd DEO, Region V

2022₱31.4M
Reported complete (DPWH)
View all 24 projects →

4. Implementation

Contract Amount

₱33,268,499.90

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 31, 2025

Target End

October 31, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateSan JacintoBagacay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.