Municipality
San Jacinto
San Jacinto, Masbate, Region V (Bicol Region). 3rd income class. Population 29,458 (2024 POPCEN).
PSGC 0504119000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to San Jacinto
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
89 records · ₱2,733,411,186.48
3 placed at San Jacinto level itself; the rest in LGUs under it.
- Cluster Iv-I: Convergence and Special Support Program-Sustainable Infrastructure Projects Alleviating Gaps (Sipag)-Flood Mitigation Structures Protecting Public Infrastructures/Facilities-Construction of Sitio Guiwanon Shore Protection Structures, Baranga₱112,708,220.27 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Cluster V-Convergence and Special Support Program-Sustainable Infrastructure Projects Alleviating Gaps (Sipag)-Flood Mitigation Structures Protecting Public Infrastructures/Facilities: V-I-Construction of Flood Control Structure, Sitio Busdak, Barangay Ba₱102,964,248.72 · 2022 · high confidence (project coordinates inside the city/municipality boundary)
- Convergence and Special Support Program - Basic Infrastructure Program (Bip) - Construction of San Fernando - San Jacinto - Monreal Road, Masbate.₱98,999,926.57 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Rehabilitation of Shore Protection Structure, Sitio Busdak, Brgy. Bartolabac, San Jacinto, Masbate₱98,999,354.98 · 2022 · high confidence (project coordinates inside the city/municipality boundary)
- Rehabilitation of Flood Mitigation Structure Along Dorong-An River, Brgy. Bagahanglad, San Jacinto, Masbate₱98,999,139.60 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Rehabilitation of Flood Mitigation Structure Along Tutuban River, Brgy. Sta. Rosa, San Jacinto, Masbate₱98,998,436.24 · 2022 · medium confidence (project coordinates inside the barangay boundary)
How linked: 86 by project coordinates inside the barangay boundary; 3 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱5,736,676.85
- Municipality of San Jacinto, Masbate₱5,736,676.85 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to San Jacinto itself. This shows the province figure for Masbate.
14,641 records · ₱69,010,548,491.53
14,256 placed at Masbate level itself; the rest in LGUs under it.
- Masbate₱69,010,548,491.53 · 14,256 awards · high confidence (area of delivery is this province only)
- Albay, Camarines Norte, Camarines Sur, Catanduanes, Masbate, Sorsogon₱176,181,300.57 · 161 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Sur, Masbate, Sorsogon₱105,154,378.00 · 31 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Norte, Masbate₱102,726,190.19 · 1 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Norte, Camarines Sur, Masbate, Sorsogon₱73,068,254.65 · 90 awards · low confidence (area of delivery lists several provinces)
- Catanduanes, Masbate, Sorsogon₱35,818,786.00 · 15 awards · low confidence (area of delivery lists several provinces)
How linked: 14,256 by area of delivery is this province only; 385 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
8 records · ₱38,927,528.68
1 placed at San Jacinto level itself; the rest in LGUs under it.
- Upgrading of Barangay Bagahanglad Water System From Level Ii to Level Iii₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
- Concreting of Roosevelt Barangay Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
- Concreting of Luna Barangay Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
- Concreting of AlmiñE Barangay Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction of Level 2 Water System Sitio Badyang₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 8 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
53 records · ₱2,347,948,000.00
32 placed at San Jacinto level itself; the rest in LGUs under it.
- Construction of Road, San Fernando - San Jacinto - Monreal Road (Danao Section), San Jacinto, Masbate₱150,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Rehabilitation of Shore Protection Structure, Brgy. Poblacion District 4, San Jacinto, Masbate₱105,000,000.00 · 2022 · high confidence (GAA line text names the place)
- Construction of Road, Barangay Mabini to Barangay Bartolabac, San Jacinto, Masbate₱100,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Construction of San Fernando - San Jacinto - Monreal Road (Bartolabac Section), San Jacinto, Masbate₱100,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Rehabilitation of Flood Mitigation Structure Along Dorong-An River, Brgy. Dorong-An, San Jacinto, Masbate₱100,000,000.00 · 2022 · high confidence (GAA line text names the place)
- Rehabilitation of Flood Mitigation Structure Along Tutuban River, Brgy. Sta. Rosa, San Jacinto, Masbate₱100,000,000.00 · 2022 · medium confidence (GAA line text names the place)
How linked: 53 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Centerways Const and Development IncContractor: Centerways Const and Development Inc
- Pattern Consistent with Contract SplittingConstruction of Flood Mitigation Structure Along Brgy. Sta. Rosa and Brgy. Burgos, San Jacinto, MasbateContractor: Centerways Const and Development Inc
- Contractor Concentration (Flood Control)Centerways Const and Development IncContractor: Centerways Const and Development Inc
- High Concurrent Workload for One ContractorCenterways Const and Development IncContractor: Centerways Const and Development Inc
- Low-Graded DPWH Contractor Winning DepEd/DOH WorksSmdf ConstContractor: Smdf Const
- Low-Graded DPWH Contractor Winning DepEd/DOH WorksNext Generation Const and Supply CorpContractor: Next Generation Const and Supply Corp
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 36 contractors on DPWH projects linked to San Jacinto and the LGUs under it. Click a column to sort.
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in Masbate
BIR publishes collections by province and city, not by town or barangay. San Jacinto is in Masbate.
₱1.10 billion
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities
Proposed for 2027: DPWH projects
5 line items worth ₱322.0M in the FY2027 National Expenditure Program (FY2026 NEP: 5 worth ₱290.0M). Counted from lines that name San Jacinto.
- Construction of Road, San Fernando- San Jacinto- Monreal Road (Pifia Section), San Jacinto Masbate Sta. 18 +818 - Sta.20 + 018 · NEP p.331₱89.0M
- San Fernando - San Jacinto - Monreal Road, Masbate - Sta. 20 + 018 - Sta. 21 + 218 · NEP p.183₱75.0M
- Construction of Road,Barangay Almifie to Barangay Pifia- Sta. 1 + 800- 3 +000, San Jacinto Masbate · NEP p.331₱58.0M
- Construction of Road, Barangay Sta. Rosa, San Jacinto Masbate- Sta. 1 + 100- Sta. 2 + · NEP p.331₱55.0M
- Construction of Road, San Fernando- San Jacinto- Monreal Road (Bartolabac Section), - Sta. 24 + 040 - Sta. 24 + 600, San Jacinto, MasbateMasbate 1st District Engineering Office · NEP p.408 · similar existing contract: Low confidence₱45.0M
Source: DBM Details of DPWH Programs/Projects, NEP FY2027 (scanned PDF read by OCR; page numbers given). Search all lines

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in San Jacinto (21)
Download this list with counts (CSV) · All bulk data
- Almiñe · 6 DPWH projects
- Bagacay · 6 DPWH projects
- Bagahanglad · 14 DPWH projects
- Bartolabac · 1 DPWH projects
- Burgos · 9 DPWH projects
- Calipat-An · 6 DPWH projects
- Danao · 2 DPWH projects
- District I · 2 DPWH projects
- District II
- District III · 6 DPWH projects
- District IV · 9 DPWH projects
- Dorong-an Daplian
- Interior · 2 DPWH projects
- Jagna-an · 1 DPWH projects
- Luna · 1 DPWH projects
- Mabini · 1 DPWH projects
- Piña · 2 DPWH projects
- Roosevelt
- San Isidro
- Santa Rosa · 13 DPWH projects
- Washington · 5 DPWH projects
QR codes for San Jacinto
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.