Flood Control and Drainage24AA0253

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF DRAINAGE CANAL, BRGY. 12, STA. FILOMENA, BACARRA, ILOCOS NORTE

BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF DRAINAGE CANAL, BRGY. 12, STA. FILOMENA, BACARRA, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱4,755,892.04. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: CAMBONG-BUILDERS INDUSTRIAL FACILITIES CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24AA0253 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-06 → 2019-02-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Ilocos Norte

Based on the coordinates published with the DPWH record and NOAH file IlocosNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF DRAINAGE CANAL, BRGY. 12, STA. FILOMENA, BACARRA, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Padsan River and Tributaries, Construction of Integrated Drainage Canal, Brgy. 23 - Brgy. 29 Laoag City, Ilocos Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

10 projects · ₱51.0M total · 0 flags

Other projects by this contractor

No sat.

CONS./IMP. OF ACC. RDS LEADING TO TRADES, INDU. AND ECO ZONES (RDS LEVE LINK. FOR INDU. AND TRADE INFRA PROG - ROLL -IT) AMPON NCC RD CON. MINIA. ITEMS SOUV. - MAKING AREA AND NATL. HWY IN SUP TO TOUR (SOUV. MAKING INDU.), BRGY. NAGSUROT, BURGOS, I.N.

Ilocos Norte 1st DEO, Region I

2024₱9.8M
Reported complete (DPWH)
No sat.

Rehabilitation of Lined Canal, Barangay 4 San Guillermo, Laoag City, Ilocos Norte

LAOAG CITY (CAPITAL) (ILOCOS NORTE), ILOCOS NORTE, Region I

2024₱4.9M
Reported complete (DPWH)
No sat.

Construction of Drainage, Barangay 12, Bacarra, Ilocos Norte

BACARRA (ILOCOS NORTE), ILOCOS NORTE, Region I

2024₱4.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABUAYAAN CREEK, BURGOS, I.N. PHASE 2

Ilocos Norte 1st DEO, Region I

2025₱4.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BRGY 1 STA. RITA, BACARRA, I.N.

Ilocos Norte 1st DEO, Region I

2025₱4.7M
Past target date (DPWH On-Going)
No sat.

SIPAG - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -IMPROVEMENT OF ROAD, BARANGAY 48-A CABUNGAAN NORTH,LAOAG CITY, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2024₱4.7M
Past target date (DPWH On-Going)
View all 10 projects →

4. Implementation

Contract Amount

₱4,755,892.04

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

February 13, 2024

Target End

May 16, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteBacarraSanta Filomena I
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.