Roads21HN0152

ROAD WIDENING - SEC. ROADS -MCR- K0027+275 - K0027+675 (MODIFIED TO: OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MACTAN CIRCUMFERENTIAL RD - K0027+275 - K0027+559)

ROAD WIDENING - SEC. ROADS -MCR- K0027+275 - K0027+675 (MODIFIED TO: OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MACTAN CIRCUMFERENTIAL RD - K0027+275 - K0027+559) is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱17,491,962.37. Status: Reported complete (DPWH). Contractor on record: PHIL ASIA RESOURCES. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21HN0152 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱25,573,044 per km= 0.6x the Region VII median (n=130)

Contract cost ₱17,491,962 ÷ 0.684 km read from the DPWH title (“K0027+275 - K0027+675; K0027+275 - K0027+559”; K-post / station range length). National percentile: 20. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING - SEC. ROADS -MCR- K0027+275 - K0027+675 (MODIFIED TO: OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MACTAN CIRCUMFERENTIAL  RD - K0027+275 - K0027+559)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control/Drainage in barangays Marigondon Phase 2, Basak and Babag, Lapu-Lapu City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Cebu 6th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

25 projects · ₱176.5M total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES-PILIPOG BR.2 (B00002LP) ALONG MACTAN CIRCUMFERENTIAL RD, CORDOVA, CEBU

Cebu 6th DEO, Region VII

2020₱20.9M
Reported complete (DPWH)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - CONSTRUCTION OF CAUSEWAY, BRGY. TUNGASAN, OLANGO ISLAND, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2023₱14.8M
Reported complete (DPWH)
No sat.

SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SIKATUNA ST., LEADING TO PARI-AN HERITAGE SHRINE, CASA GORORDO, METROPOLITAN CATHEDRAL, BRGY. ZAPATERA, CEBU CITY

Cebu City DEO, Region VII

2018₱12.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, P. ATILLO TO M. GOCHAN STREET, LEADING TO UPTOWN AREA OF CEBU CITY, LABANGON AND BANAWA, CEBU CITY

Cebu City DEO, Region VII

2019₱12.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SANCIANGKO STREET LEADING TO PARI-AN HERITAGE SHRINE, CASA GORORDO METROPOLITAN CATHEDRAL, TABO-AN PUBLIC MARKET, BRGY. KAMAGAYAN (POB.), CEBU CITY

Cebu City DEO, Region VII

2018₱11.9M
Reported complete (DPWH)
View all 25 projects →

4. Implementation

Contract Amount

₱17,491,962.37

Progress

Reported complete (DPWH)

Start Date

November 18, 2021

Target End

March 17, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuCordovaAlegria
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.