GAA 2024 SSP24BF0116

CONSTRUCTION OF HALL OF JUSTICE, BARANGAY RIZAL, ROXAS, ISABELA

CONSTRUCTION OF HALL OF JUSTICE, BARANGAY RIZAL, ROXAS, ISABELA is a DPWH-tracked public work in Isabela 2nd DEO, Region II. Reported contract value: ₱48,949,952.95. Status: Past target date (DPWH On-Going). Contractor on record: RR BUILDERS. Figures trace to dpwh.

Isabela 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24BF0116 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    91% reported · imagery 2019-03-08 → 2019-03-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF HALL OF JUSTICE,  BARANGAY RIZAL, ROXAS, ISABELA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Mallig River Flood Control Project, Barangay San Juan, Quirino, Isabela Sta Sta 0 + 000 - Sta 0 + 388
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Isabela 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

55 projects · ₱644.8M total · 0 flags

Other projects by this contractor

No sat.

OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (CULLALABO SUR SECTION), BARANGAY CULLALABO, BURGOS, ISABELA

Isabela 2nd DEO, Region II

2025₱140.4M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS - CONSTRUCTION OF MALACOPA CREEK RIVER FLOOD CONTROL PROJECT ALONG PRESIDENT BRIDGE (UPSTREAM SECTION) BARANGAY DALIG-KALINGA, AURORA, ISABELA

Isabela 2nd DEO, Region II

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY EDEN, MUNICIPALITY OF SAN MANUEL, ISABELA

Isabela 2nd DEO, Region II

2021₱24.0M
Reported complete (DPWH)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLICBUILDINGS/ FACILITIES - CONSTRUCTION OF SANTA CRUZ - CAGURUNGAN EDEN ROAD, SAN MANUEL, ISABELA STA. 0+000 TO 1+330, CONSTRU

Isabela 2nd DEO, Region II

2025₱24.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF STANDARD TWO-STOREY 10 CLASSROOM SCHOOL BUILDING, MUÑOZ HIGH SCHOOL, ROXAS, ISABELA

Isabela 2nd DEO, Region II

2019₱20.0M
Reported complete (DPWH)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES- CONSTRUCTION OF BRGY. BAGNOS TO BRGY. ESPERANZA EAST ROAD, AURORA, ISABELA

Isabela 2nd DEO, Region II

2022₱19.5M
Reported complete (DPWH)
View all 55 projects →

4. Implementation

Contract Amount

₱48,949,952.95

Progress

Past target date (DPWH On-Going)

Start Date

September 18, 2024

Target End

October 4, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaRoxasRizal
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.