CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUNCALALAN RIVER, TABOC SECTION (PACKAGE 1), OPOL, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUNCALALAN RIVER, TABOC SECTION (PACKAGE 1), OPOL, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 2nd DEO, Region X. Reported contract value: ₱47,963,559.90. Status: Reported complete (DPWH). Contractor on record: CAGALAWAN ENT. Figures trace to dpwh.
Total Contract Cost

