Flood Control and Drainage20L00067

CONSTRUCTION OF HIJO RIVER FLOOD CONTROL FROM BRGY. MAGDUM-BRGY. EST-BRGY.APOKON, TAGUM CITY, DAVAO DEL NORTE

CONSTRUCTION OF HIJO RIVER FLOOD CONTROL FROM BRGY. MAGDUM-BRGY. EST-BRGY.APOKON, TAGUM CITY, DAVAO DEL NORTE is a DPWH-tracked public work in Region XI, Region XI. Reported contract value: ₱54,742,967.85. Status: Reported complete (DPWH). Contractor on record: MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP. Figures trace to dpwh.

Region XI, Region XI
Region: Region XI

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20L00067 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-08-10 → 2019-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Davao del Norte

Based on the coordinates published with the DPWH record and NOAH file DavaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF HIJO RIVER FLOOD CONTROL FROM BRGY. MAGDUM-BRGY. EST-BRGY.APOKON, TAGUM CITY, DAVAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2020 GAA. DBM GAA FY2020

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

4. Implementation

Contract Amount

₱54,742,967.85

Progress

Reported complete (DPWH)

Start Date

June 16, 2020

Target End

May 15, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao del NorteCity of TagumMagugpo East
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.