Construction of Flood Mitigation Structure23CN0114

Construction of Flood Control Structure, Brgy. Kadayacan, Maria Aurora, Aurora

Construction of Flood Control Structure, Brgy. Kadayacan, Maria Aurora, Aurora is a DPWH-tracked public work in MARIA AURORA (AURORA), AURORA, Region III. Reported contract value: ₱29,400,000.00. Status: Reported complete (DPWH). Contractor on record: DALCON CONST. Figures trace to sumbong.

MARIA AURORA (AURORA), AURORA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱30,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-23-0022700 · ₱240,667

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23CN0114 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-06-03 → 2025-01-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Aurora

Based on the coordinates published with the DPWH record and NOAH file Aurora.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure, Brgy. Kadayacan, Maria Aurora, Aurora

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Brgy. Kadayacan, Maria Aurora, Aurora
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-23-0022700

₱240,667.00 · FY2023

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

268 projects · ₱17.0B total · 43 flags

4. Implementation

Contract Amount

₱29,400,000.00

Progress

Reported complete (DPWH)

Start Date

March 28, 2023

Target End

August 27, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraMaria AuroraSan Joaquin
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025Kajiki 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.