Flood Control and Drainage25HK0045

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAGSALA RIVER, TANJAY CITY

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAGSALA RIVER, TANJAY CITY is a DPWH-tracked public work in Negros Oriental 2nd DEO, Negros Island Region. Reported contract value: ₱101,267,100.00. Status: Past target date (DPWH On-Going). Contractor on record: PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS. Figures trace to dpwh.

Negros Oriental 2nd DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25HK0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    59% reported · imagery 2015-07-25 → 2025-10-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Negros Oriental

Based on the coordinates published with the DPWH record and NOAH file NegrosOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAGSALA RIVER, TANJAY CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bio-os River, Amlan, Negros Oriental
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Negros Oriental 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

276 projects · ₱11.8B total · 28 flags

Other projects by this contractor

No sat.

CSSP, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, REHAB./ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG BAIS-KABANKALAN RD - K0070+000 - K0071+000, K0075 + 459 - K0076 + 598, K0087+000-K0088+054, K0090+00-K0091+000,

Region VII, Region VII

2024₱253.4M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/WIDENING OF DUMAGUETE SOUTH RD INCLUDING RROW (S00275NR), K0011+360 - K0012+277.46; K0012+310 - K0016+340, BACONG, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2017₱152.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY NORTH POBLACION, JIMALALUD, NEGROS ORIENTAL

Negros Island Region, Negros Island Region

2025₱149.6M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/ WIDENING OF METRO DUMAGUETE DIVERSION ROAD INCL. RROW, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2017₱146.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS DUMAGUETE NORTH RD-K0025+000-K0025+223, K0025+238-K0026+000, K0027+598-K0028+740, NEGROS ORIENTAL PROVINCE

Region VII, Region VII

2020₱144.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : SECONDARY ROADS: STA. CATALINA-PAMPLONA-TANJAY CITY - K0067 + 500 - K0072 + 000, STA. CATALINA, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2025₱144.6M
Past target date (DPWH On-Going)
View all 276 projects →

4. Implementation

Contract Amount

₱101,267,100.00

Progress

Past target date (DPWH On-Going)

Start Date

February 20, 2025

Target End

November 4, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalCity of TanjaySanta Cruz Nuevo
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.