Flood Control and Drainage25AB0176

REPAIR / REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (BOTH BANK), BRGY. SAN AGUSTIN, PAOAY, ILOCOS NORTE

REPAIR / REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (BOTH BANK), BRGY. SAN AGUSTIN, PAOAY, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱28,113,291.81. Status: Past target date (DPWH On-Going). Contractor on record: RCD GEN CONTRACTOR. Figures trace to dpwh.

Ilocos Norte 2nd DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25AB0176 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    90% reported · imagery 2024-01-15 → 2025-09-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Ilocos Norte

Based on the coordinates published with the DPWH record and NOAH file IlocosNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR / REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (BOTH BANK), BRGY. SAN AGUSTIN, PAOAY, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control and River Control Structure along Bongo River, Barangay Sinamar, Banna, Ilocos Norte
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ilocos Norte 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

187 projects · ₱1.8B total · 0 flags

Other projects by this contractor

View all 187 projects →

4. Implementation

Contract Amount

₱28,113,291.81

Progress

Past target date (DPWH On-Going)

Start Date

April 7, 2025

Target End

July 27, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “REPAIR / REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (BOTH BANK), BRGY. SAN AGUSTIN, PAOAY, ILOCOS NORTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/9598a2d1-7ad6-4481-882d-a82e0f5003ae

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NortePaoaySan Agustin
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.