CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN PEDRO SECTION DOWNSTREAM), ROXAS, ISABELA
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN PEDRO SECTION DOWNSTREAM), ROXAS, ISABELA is a DPWH-tracked public work in Isabela 2nd DEO, Region II. Reported contract value: ₱45,390,237.09. Status: Reported complete (DPWH). Contractor on record: GACUTAN CONST INC FORMERLY: GACUTAN CONST. Figures trace to dpwh.
Total Contract Cost





