Construction of flood mitigation structures along Marayo River, Pontevedra, Negros Occidental
Construction of flood mitigation structures along Marayo River, Pontevedra, Negros Occidental is a DPWH-tracked public work in PONTEVEDRA (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VI. Reported contract value: ₱48,925,761.61. Status: Reported complete (DPWH). Contractor on record: JAIME B CHING ENT. Figures trace to sumbong.
Total Contract Cost

