Flood Control and Drainage20NA0020

CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF GUINOYORAN RIVER FLOOD CONTROL WITH RECHANNELIZATION (DOWNSTREAM SECTION), SANTIAGO, AGUSAN DEL NORTE

CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF GUINOYORAN RIVER FLOOD CONTROL WITH RECHANNELIZATION (DOWNSTREAM SECTION), SANTIAGO, AGUSAN DEL NORTE is a DPWH-tracked public work in Agusan del Norte DEO, Region XIII. Reported contract value: ₱24,499,997.81. Status: Reported complete (DPWH). Contractor on record: ERRA CONST AND DEVELOPMENT INC FORMERLY ERRA CONST. Figures trace to dpwh.

Agusan del Norte DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱25,000

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20NA0020 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-05-05 → 2025-11-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Agusan del Norte

Based on the coordinates published with the DPWH record and NOAH file AgusanDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF GUINOYORAN RIVER FLOOD CONTROL WITH RECHANNELIZATION (DOWNSTREAM SECTION), SANTIAGO, AGUSAN DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Guinoyoran River Flood Control with Rechannelization (Downstream Section), Santiago, Agusan del Norte
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Agusan del Norte DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

14 projects · ₱427.2M total · 2 flags

4. Implementation

Contract Amount

₱24,499,997.81

Progress

Reported complete (DPWH)

Start Date

April 12, 2020

Target End

November 29, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Agusan del NorteSantiagoSan Isidro
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.