Flood Control and Drainage25OF0229

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TULLAHAN RIVER AND TRIBUTARIES (PHASE 3), BARANGAY FAIRVIEW, QUEZON CITY

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TULLAHAN RIVER AND TRIBUTARIES (PHASE 3), BARANGAY FAIRVIEW, QUEZON CITY is a DPWH-tracked public work in Quezon City 1st DEO, National Capital Region. Reported contract value: ₱94,570,200.98. Status: Past target date (DPWH On-Going). Contractor on record: LE BRON CONST. Figures trace to dpwh.

Quezon City 1st DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱94,570,201 · LE BRON CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    0% reported · imagery 2025-04-25 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, Second District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TULLAHAN RIVER AND TRIBUTARIES (PHASE 3), BARANGAY FAIRVIEW, QUEZON CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Structure and Tributaries at Barangay Payatas (Phase 9), Quezon City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Quezon City 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25OF0229 (RE-ADS FROM ID NO. 25OF0161) - CONSTRUCT

₱94,570,200.98 · LE BRON CONSTRUCTION

Contractor

C

249 projects · ₱16.0B total · 11 flags

4. Implementation

Contract Amount

₱94,570,200.98

Progress

Past target date (DPWH On-Going)

Start Date

June 10, 2025

Target End

June 4, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)Quezon CityFairview
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.