Roads23JG0008

ASSET PRESERVATION/PREVENTIVE MAINTENANCE /TERTIARY ROADS ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD - K1723 + 500 - K1725 + 174, BAGONG KAHAYAG, LAKEWOOD, ZAMBOANGA DEL SUR

ASSET PRESERVATION/PREVENTIVE MAINTENANCE /TERTIARY ROADS ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD - K1723 + 500 - K1725 + 174, BAGONG KAHAYAG, LAKEWOOD, ZAMBOANGA DEL SUR is a DPWH-tracked public work in Zamboanga del Sur 2nd DEO, Region IX. Reported contract value: ₱23,294,252.00. Status: Reported complete (DPWH). Contractor on record: BADSBRO CONST AND GEN MERCHANDISE. Figures trace to dpwh.

Zamboanga del Sur 2nd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱60,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23JG0008 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-05-05 → 2025-05-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱13,915,324 per km= 0.5x the Region IX median (n=103)

Contract cost ₱23,294,252 ÷ 1.674 km read from the DPWH title (“K1723 + 500 - K1725 + 174”; K-post / station range length). National percentile: 22. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION/PREVENTIVE MAINTENANCE /TERTIARY ROADS ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD - K1723 + 500 - K1725 + 174, BAGONG KAHAYAG, LAKEWOOD, ZAMBOANGA DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱60,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Maribabao Creek along SindanGAN-Bayog-Lakewood Road (S01173MN), Brgy. Poblacion, Lakewood, Zamboanga del Sur
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Zamboanga del Sur 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

245 projects · ₱12.0B total · 1 flags

4. Implementation

Contract Amount

₱23,294,252.00

Progress

Reported complete (DPWH)

Start Date

February 27, 2023

Target End

May 14, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del SurLakewood
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.