Buildings and Facilities17HD0108No coordinates published by DPWH

CONSTRUCTION OF 4 STOREY-8 CLASSROOM SCHOOL BUILDING, LA PAZ NHS, BOGO CITY, CEBU

CONSTRUCTION OF 4 STOREY-8 CLASSROOM SCHOOL BUILDING, LA PAZ NHS, BOGO CITY, CEBU is a DPWH-tracked public work in Cebu 4th DEO, Region VII. Reported contract value: ₱17,858,909.45. Status: Reported complete (DPWH). Contractor on record: P B OBIAL CONST. Figures trace to dpwh.

Cebu 4th DEO, Region VII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0011285 · ₱113,011 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17HD0108 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 4 STOREY-8 CLASSROOM SCHOOL BUILDING, LA PAZ NHS, BOGO CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Polo river flood control Alcantara, Cebu
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0011285

₱113,011.00 · FY2017

Released to Calbiga National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

182 projects · ₱4.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SOUTH ROAD PROPERTY (SRP)

Region VII, Region VII

2022₱241.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL ROAD, CEBU PROVINCE

Region VII, Region VII

2021₱173.7M
Reported complete (DPWH)
No sat.

PROPOSED BIKE LANES IN METRO CEBU, COVERING THE CITIES OF TALISAY, CEBU, MANDAUE AND LAPU-LAPU CITY

Region VII, Region VII

2020₱150.0M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT), K0974+500 - K0974+800, K0974+907 - K0975+150, K0984+000 - K0987+000, LEYTE 5TH

Region VIII, Region VIII

2024₱146.4M
Reported complete (DPWH)
No sat.

MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, REHABILITATION/IMPROVEMENT OF ROAD AT F.E. ZUELIG AVENUE WITH DRAINAGE FACILITIES, MANDAUE CITY

Region VII, Region VII

2017₱144.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0045+280 - K0045+550

Region VII, Region VII

2022₱117.2M
Reported complete (DPWH)
View all 182 projects →

4. Implementation

Contract Amount

₱17,858,909.45

Progress

Reported complete (DPWH)

Start Date

December 27, 2017

Target End

July 24, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.