Flood Control and Drainage21BC0097

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIVER DYKE CONTROL AT CABAGGAN BRIDGE, BARANGAY CABAGGAN, PAMPLONA, CAGAYAN

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIVER DYKE CONTROL AT CABAGGAN BRIDGE, BARANGAY CABAGGAN, PAMPLONA, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱3,960,000.00. Status: Reported complete (DPWH). Contractor on record: J AURELLANO CONST. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21BC0097 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-08-05 → 2024-09-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cagayan

Based on the coordinates published with the DPWH record and NOAH file Cagayan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIVER DYKE CONTROL AT CABAGGAN BRIDGE, BARANGAY CABAGGAN, PAMPLONA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cabicungan Flood Control project, C-4, Claveria, Cagayan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Cagayan 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

38 projects · ₱265.0M total · 0 flags

Other projects by this contractor

No sat.

CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱27.0M
Reported complete (DPWH)
No sat.

CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)- STA. FILOMENA-LANGAY ROAD LEADING TO JCT. AYAGA IN SUPPORT OF AGRI-BUSINESS, BANGUIAN, AND STA. FILOMENA, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2021₱26.2M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONCRETING OF BARANGAY ROAD, BRGY. CALOG SUR, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2020₱19.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP)- ABULUG- BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS,

Cagayan 2nd DEO, Region II

2024₱19.3M
Reported complete (DPWH)
No sat.

CONCRETING OF INNER CUBA, SITIO CUBA, BRGY. CALOG SUR FMR TO BRGY. SIMAYUNG FMR, BRGY. CALOG SUR AND BRGY. SIMAYUNG, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱14.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES: LOCAL ROADS-CONCRETING OF COLONIAL ROAD, SITIO PAGAPPO, GUIDDAM, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2021₱14.7M
Reported complete (DPWH)
View all 38 projects →

4. Implementation

Contract Amount

₱3,960,000.00

Progress

Reported complete (DPWH)

Start Date

March 25, 2021

Target End

June 23, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanPamplonaCabaggan
Storms whose wind field reached it
Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.