CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY TAMDAGAN, SITIO NAGALANGAN, RIGHT BANK, DOWNSTREAM OF TAMDAGAN BRIDGE, VINTAR, ILOCOS NORTE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY TAMDAGAN, SITIO NAGALANGAN, RIGHT BANK, DOWNSTREAM OF TAMDAGAN BRIDGE, VINTAR, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱96,499,999.16. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to dpwh.
Total Contract Cost
