Flood Control and Drainage21LG0023

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAYO RIVER , MATI , DAVAO ORIENTAL ( PHASE II) CITY OF MATI, DAVAO ORIENTAL

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAYO RIVER , MATI , DAVAO ORIENTAL ( PHASE II) CITY OF MATI, DAVAO ORIENTAL is a DPWH-tracked public work in Davao Oriental 2nd DEO, Region XI. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: MAER SUMMIT KONSTRUKT CO. Figures trace to dpwh.

Davao Oriental 2nd DEO, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱50,000

    Probable match · score 0.92

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱47,526,516 · MAER SUMMIT KONSTRUKT CO

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-11-16 → 2025-01-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Davao Oriental

Based on the coordinates published with the DPWH record and NOAH file DavaoOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAYO RIVER , MATI , DAVAO ORIENTAL ( PHASE II) CITY OF MATI, DAVAO ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Mayo River, Mati, Davao Oriental (Phase II)
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Davao Oriental 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱49,000,000.00

Progress

Reported complete (DPWH)

Start Date

April 12, 2021

Target End

January 8, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OrientalCity of MatiMayo
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.