Construction of Flood Mitigation Structure22BG0079

Construction of Flood Control Structure along the bank of Cagayan River, Centro 1, Angadanan, Isabela

Construction of Flood Control Structure along the bank of Cagayan River, Centro 1, Angadanan, Isabela is a DPWH-tracked public work in ANGADANAN (ISABELA), ISABELA, Region II. Reported contract value: ₱42,002,289.88. Status: Reported complete (DPWH). Contractor on record: DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST. Figures trace to sumbong.

ANGADANAN (ISABELA), ISABELA, Region II
Region: Region II

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱43,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0002982 · ₱412,104,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱41,506,809 · DANYSONS CONSTRUCTION AND DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-05-24 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Isabela

Based on the coordinates published with the DPWH record and NOAH file Isabela.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure along the bank of Cagayan River, Centro 1, Angadanan, Isabela

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱43,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along the bank of Cagayan River, Centro 1, Angadanan, Isabela
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002982

₱412,104,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003013

₱65,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22BG0079-Convergence and Special Support Program -

₱41,506,809.32 · DANYSONS CONSTRUCTION AND DEVELOPMENT

Award / contract ref: 22BG0079

Contractor

B

138 projects · ₱4.1B total · 11 flags

Other projects by this contractor

View all 138 projects →

4. Implementation

Contract Amount

₱42,002,289.88

Progress

Reported complete (DPWH)

Start Date

February 14, 2022

Target End

January 19, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaAngadananCentro II
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.