Rehabilitation / Major Repair of Flood Mitigation Facility23OD0166

Improvement of Don Pedro Relief Pumping Station (Phase II), Barangay Marulas, Valenzuela City

Improvement of Don Pedro Relief Pumping Station (Phase II), Barangay Marulas, Valenzuela City is a DPWH-tracked public work in CITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY, National Capital Region. Reported contract value: ₱141,709,642.40. Status: Reported complete (DPWH). Contractor on record: TWO DIMENSION CONST. Figures trace to sumbong.

CITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱20,676

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱141,709,642 · TWO DIMENSION CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-01 → 2025-01-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, Third District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Improvement of Don Pedro Relief Pumping Station (Phase II), Barangay Marulas, Valenzuela City

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱20,676,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Wall at Tampoy/F. Bautista, Barangay Marulas, Valenzuela City
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Metro Manila 3rd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

23OD0166

₱141,709,642.41 · TWO DIMENSION CONSTRUCTION

Award / contract ref: 23OD0166

Contractor

B

98 projects · ₱2.0B total · 3 flags

Other projects by this contractor

View all 98 projects →

4. Implementation

Contract Amount

₱141,709,642.40

Progress

Reported complete (DPWH)

Start Date

April 28, 2023

Target End

April 21, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ValenzuelaMarulas
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.