Roads20FA0085

REHAB. AND IMPROVEMENT OF NATIONAL ROADS WITH SLIPS/LANDSLIDE ALONG MT. MAYON PARK ROADS, K0520+(-009)-K0520+028

REHAB. AND IMPROVEMENT OF NATIONAL ROADS WITH SLIPS/LANDSLIDE ALONG MT. MAYON PARK ROADS, K0520+(-009)-K0520+028 is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱17,592,915.00. Status: Reported complete (DPWH). Contractor on record: SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL. Figures trace to dpwh.

Albay 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FA0085 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-09-27 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHAB. AND IMPROVEMENT OF NATIONAL ROADS WITH SLIPS/LANDSLIDE ALONG MT. MAYON PARK ROADS, K0520+(-009)-K0520+028

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Control and Flood Mitigation of the Baclayon River, Brgy. Baclayon, Bacacay, Albay
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Albay 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

83 projects · ₱4.9B total · 4 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ESPERANZA-PLACER ROAD LEADING TO PASIAGON BEACH FRONT, BALAY NA BATO AND ESPERANZA SEAPORT, MASBATE, ESPERANZA, MASBATE(3RD LEGISLAT

Region V, Region V

2020₱159.2M
Reported complete (DPWH)

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY PAWA AN

Region V, Region V

2024₱149.6M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) STA. ELENA - CAPALONGA BY PASS COASTAL ROAD, KO270+760 - KO274+300, CAMARINES NORTE

Region V, Region V

2016₱146.2M
Reported complete (DPWH)

Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay

CITY OF TABACO (ALBAY), ALBAY, Region V

2023₱144.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ESPERANZA-PLACER ROAD LEADING TO PASIAGON BEACH FRONT, BALAY NA BATO AND ESPERANZA SEAPORT, MASBATE, ESPERANZA, MASBATE(3RD LEGISLATI

Region V, Region V

2021₱135.7M
Reported complete (DPWH)

Construction of Pinagbobong River Control, Barangay Pinagbobong, Tabaco City, Albay

CITY OF TABACO (ALBAY), ALBAY, Region V

2023₱135.1M
Reported complete (DPWH)
View all 83 projects →

4. Implementation

Contract Amount

₱17,592,915.00

Progress

Reported complete (DPWH)

Start Date

December 29, 2020

Target End

May 22, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of TabacoBuang
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.