Bridges22C00024

BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, SAN FERNANDO FLYOVER ALONG JOSE ABAD SANTOS AVENUE (JASA), PROVINCE OF PAMPANGA

BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, SAN FERNANDO FLYOVER ALONG JOSE ABAD SANTOS AVENUE (JASA), PROVINCE OF PAMPANGA is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱67,540,588.03. Status: Reported complete (DPWH). Contractor on record: NICLEDON CONST. Figures trace to dpwh.

Region III, Region III
Region: Region III

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

15 projects · ₱578.8M total · 1 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUITANGIL RIVER, DOWNSTREAM OF OF QUITANGIL BRIDGE, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱103.1M
Past target date (DPWH On-Going)

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BANCAL DANAC BUNGA SECTION, BOTOLAN, ZAMBALES

Zambales 1st DEO, Region III

2024₱98.9M
Reported complete (DPWH)
No sat.

REPAIR/REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL LEFT DIKE, TIBAG SECTION, TARLAC CITY, TARLAC

Tarlac DEO, Region III

2024₱76.9M
Reported complete (DPWH)
No sat.

Construction Slope Protection Structure along Abacan River, Barangay Anunas to Barangay Malabañas (Phase II), Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2024₱49.0M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY MESALIPIT - TALBA, BACOLOR, PAMPANGA

Pampanga 1st DEO, Region III

2025₱37.3M
Ongoing (DPWH-reported)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF TALBA - TINAJERO ROAD INCLUDING DRAINAGE SYSTEM, BACOLOR, PAMPA

Pampanga 1st DEO, Region III

2022₱37.2M
Reported complete (DPWH)
View all 15 projects →

4. Implementation

Contract Amount

₱67,540,588.03

Progress

Reported complete (DPWH)

Start Date

July 4, 2022

Target End

August 27, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.