CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG AGURAN RIVER CONTROL/ DRAINAGE SYSTEM ALONG CCR AGURAN BRIDGE
CONSTRUCTION OF RUBBLE CONCRETE DIKE ALONG AGURAN RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR AGURAN BRIDGE is a DPWH-tracked public work in Camiguin DEO, Region X. Reported contract value: ₱13,979,835.16. Status: Reported complete (DPWH). Contractor on record: SHEEN-SHEEN CONST CORP FORMERLY: SHEEN-SHEEN CONST. Figures trace to dpwh.
Total Contract Cost
