Roads22FI0008

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF JCT. NATIONAL ROAD - BRGY. VILLA ALVAREZ - BRGY. SALVACION, STA. 0+500 - STA. 0+980, BALUD, MASBATE

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF JCT. NATIONAL ROAD - BRGY. VILLA ALVAREZ - BRGY. SALVACION, STA. 0+500 - STA. 0+980, BALUD, MASBATE is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱13,720,000.00. Status: Reported complete (DPWH). Contractor on record: EJ CANTORIA CONST. Figures trace to dpwh.

Masbate 2nd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱36,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FI0008 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-01 → 2020-08-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱28,583,333 per km= 1.3x the Region V median (n=151)

Contract cost ₱13,720,000 ÷ 0.48 km read from the DPWH title (“STA. 0+500 - STA. 0+980”; K-post / station range length). National percentile: 54. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF JCT. NATIONAL ROAD - BRGY. VILLA ALVAREZ - BRGY. SALVACION, STA. 0+500 - STA. 0+980, BALUD, MASBATE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱36,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Concrete Revetment at Buenavista River, Brgy. Magsaysay Uson, Masbate
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Masbate 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

31 projects · ₱488.0M total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - POBLACION-MOROCBOROCAN-GUINHADAP-MAGLAMBONG-STO. NIÑO ROAD (PACKAGE 4), MONREAL, MASBATE.

Masbate 1st DEO, Region V

2024₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF SHORE PROTECTION STRUCTURE, CAGAS, SAN JACINTO, MASBATE.

Masbate 1st DEO, Region V

2025₱47.5M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM:LOCAL ROADS AND BRIDGES - LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF ANTIPOLO-MIABAS ROAD, PALANAS, MASBATE

Masbate 3rd DEO, Region V

2021₱47.0M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-SAN FERNANDO NORTH RD-K0002+259-K0002+317, K0002+717-K0002+802, K0003+630-K0003+693, K0005+000-K0005+036, K0010+238-K0010+558,K0010+561-K0010+586,K0011+678-K0011+1010.

Masbate 1st DEO, Region V

2024₱42.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM - CONSTRUCTION OF ACCESS ROAD, JUNCTION NATIONAL ROAD, LETADA ST. TO PORT, BARANGAY POBLACION, DISTRICT 1 AND DISTRICT 3, SAN JACINTO, MASBATE.

Masbate 1st DEO, Region V

2024₱29.7M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. SAN ROQUE - BRGY. SOROSIMBAHAN FMR, BRGY. SAN ROQUE AND BRGY. SOROSIMBAHAN, ESPERANZA, MASBATE

Masbate 3rd DEO, Region V

2019₱24.4M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱13,720,000.00

Progress

Reported complete (DPWH)

Start Date

February 14, 2022

Target End

May 26, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF JCT. NATIONAL ROAD - BRGY. VILLA ALVAREZ - BRGY. SALVACION, STA. 0+500 - STA. 0+980, BALUD, MASBATE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/d6604815-6f9c-4c2e-8180-f228b0528b5a

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateMilagrosPoblacion East
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →