Flood Control and Drainage22O00094

CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM AND ROADS LEADING TO INTERCEPTOR/BOX CULVERT IN NAVOTAS CITY

CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM AND ROADS LEADING TO INTERCEPTOR/BOX CULVERT IN NAVOTAS CITY is a DPWH-tracked public work in Flood Control Management Cluster, Central Office. Reported contract value: ₱101,255,576.14. Status: Reported complete (DPWH). Contractor on record: PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP. Figures trace to dpwh.

Flood Control Management Cluster, Central Office
Region: Central Office

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱98,893,772 · PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-10-29 → 2024-04-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · NCR, Third District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM AND ROADS LEADING TO INTERCEPTOR/BOX CULVERT IN NAVOTAS CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22O00094

₱98,893,772.27 · PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP

Award / contract ref: 22O00094

Contractor

C

16 projects · ₱1.6B total · 0 flags

4. Implementation

Contract Amount

₱101,255,576.14

Progress

Reported complete (DPWH)

Start Date

October 27, 2022

Target End

October 21, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of NavotasSipac-Almacen
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.