Buildings and Facilities16PD0010No coordinates published by DPWH

CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF 4-STOREY 12 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAIN

CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF 4-STOREY 12 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAIN is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱22,154,821.81. Status: Reported complete (DPWH). Contractor on record: JOMARCANN GEN CONST. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0011713 · ₱60,921,463 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱22,154,822 · JOMARCANN GENERAL CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF 4-STOREY 12 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAIN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Flood Mitigation Facilitites along Bued River, Baguio City LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0011713

₱60,921,463.00 · FY2016

Released to Western Visayas Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱22,154,821.81 · JOMARCANN GENERAL CONSTRUCTION

Award / contract ref: 16PD0010

Contractor

B

41 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS (SECONDARY ROADS) BAGUIO - BONTOC ROAD K0267+810-K0268+000, K0270+000-K0270+178, K0279+00

Cordillera Administrative Region, Cordillera Administrative Region

2018₱210.4M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA

Region II, Region II

2023₱182.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE (SECONDARY ROADS) BAGUIO BONTOC ROAD

Cordillera Administrative Region, Cordillera Administrative Region

2019₱129.3M
Reported complete (DPWH)
No sat.

RD UPGRNG CLAVERIA - CALANASAN - KABUGAO ROAD, K0661+929

Cordillera Administrative Region, Cordillera Administrative Region

2016₱123.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MARCOS HI-WAYKO272+800 - KO272+909TUBA, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2021₱120.6M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT (HDM-4) BAGUIO - BONTOC ROAD, K0265+750-K0266+000, K0266+000-K0266+475, K0266+680-K0266+840, K

Cordillera Administrative Region, Cordillera Administrative Region

2017₱112.2M
Reported complete (DPWH)
View all 41 projects →

4. Implementation

Contract Amount

₱22,154,821.81

Progress

Reported complete (DPWH)

Start Date

May 30, 2016

Target End

December 10, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of Baguio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.