Flood Control and Drainage17LC0011

CONSTRUCTION OF MANGALCAL BANK PROTECTION ALONG CARMEN-DAPECOL COMPOUND ROAD, K1474+297-K1475+447.40, DAVAO DEL NORTE

CONSTRUCTION OF MANGALCAL BANK PROTECTION ALONG CARMEN-DAPECOL COMPOUND ROAD, K1474+297-K1475+447.40, DAVAO DEL NORTE is a DPWH-tracked public work in Davao del Norte DEO, Region XI. Reported contract value: ₱29,399,946.60. Status: Reported complete (DPWH). Contractor on record: FFJJ CONST. Figures trace to dpwh.

Davao del Norte DEO, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱10,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0025737 · ₱6,325,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱28,518,000 · FFJJ CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-17 → 2026-03-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱25,556,282 per km= 1.2x the Region XI median (n=48)

Contract cost ₱29,399,947 ÷ 1.15 km read from the DPWH title (“K1474+297-K1475+447.40”; K-post / station range length). National percentile: 47. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Davao del Norte

Based on the coordinates published with the DPWH record and NOAH file DavaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MANGALCAL BANK PROTECTION ALONG CARMEN-DAPECOL COMPOUND ROAD, K1474+297-K1475+447.40, DAVAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Ising River Upstream, Davao Del Norte
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0025737

₱6,325,000.00 · FY2017

Released to Iwahig Prison an Penal Farm (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Mangalcal bank

₱28,518,000.00 · FFJJ CONSTRUCTION

Award / contract ref: 17LC0011

4. Implementation

Contract Amount

₱29,399,946.60

Progress

Reported complete (DPWH)

Start Date

March 3, 2017

Target End

October 28, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao del NorteCarmenIsing
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.