Bridges18GG0042

REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE, ULIAN BRIDGE (BP00193PN) ALONG ILOILO - CAPIZ ROAD (NEW ROUTE), BRGY. TINUCUAN, DUEÑAS, ILOILO

REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE, ULIAN BRIDGE (BP00193PN) ALONG ILOILO - CAPIZ ROAD (NEW ROUTE), BRGY. TINUCUAN, DUEÑAS, ILOILO is a DPWH-tracked public work in Iloilo 2nd DEO, Region VI. Reported contract value: ₱20,266,615.89. Status: Reported complete (DPWH). Contractor on record: P B OBIAL CONST. Figures trace to dpwh.

Iloilo 2nd DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-18-0033578 · · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18GG0042 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-20 → 2025-09-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE, ULIAN BRIDGE (BP00193PN) ALONG ILOILO - CAPIZ ROAD (NEW ROUTE), BRGY. TINUCUAN, DUEÑAS, ILOILO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control/Slope Protection along Jalaur River in Brgy. Balabag-Maquina, Dumangas, Iloilo
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-18-0033578

₱0.00 · FY2018

Released to Division of Ilocos Sur (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

182 projects · ₱4.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SOUTH ROAD PROPERTY (SRP)

Region VII, Region VII

2022₱241.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL ROAD, CEBU PROVINCE

Region VII, Region VII

2021₱173.7M
Reported complete (DPWH)
No sat.

PROPOSED BIKE LANES IN METRO CEBU, COVERING THE CITIES OF TALISAY, CEBU, MANDAUE AND LAPU-LAPU CITY

Region VII, Region VII

2020₱150.0M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT), K0974+500 - K0974+800, K0974+907 - K0975+150, K0984+000 - K0987+000, LEYTE 5TH

Region VIII, Region VIII

2024₱146.4M
Reported complete (DPWH)
No sat.

MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, REHABILITATION/IMPROVEMENT OF ROAD AT F.E. ZUELIG AVENUE WITH DRAINAGE FACILITIES, MANDAUE CITY

Region VII, Region VII

2017₱144.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0045+280 - K0045+550

Region VII, Region VII

2022₱117.2M
Reported complete (DPWH)
View all 182 projects →

4. Implementation

Contract Amount

₱20,266,615.89

Progress

Reported complete (DPWH)

Start Date

February 20, 2018

Target End

June 19, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)IloiloDueñasCapuling
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.