Flood Control and Drainage24PG0015

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TINOC RIVER, STA. 103+900 - STA. 104+415, DANGGO, TINOC, IFUGAO

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TINOC RIVER, STA. 103+900 - STA. 104+415, DANGGO, TINOC, IFUGAO is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱36,188,771.07. Status: Reported complete (DPWH). Contractor on record: DJY CONST. Figures trace to dpwh.

Ifugao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱37,278

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24PG0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-10 → 2025-10-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱70,269 per linear m= 0.9x the Cordillera Administrative Region median (n=212)

Contract cost ₱36,188,771 ÷ 515 linear m read from the DPWH title (“STA. 103+900 - STA. 104+415”; station range length (Sta. a+b to c+d)). National percentile: 23. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Ifugao

Based on the coordinates published with the DPWH record and NOAH file Ifugao.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TINOC RIVER, STA. 103+900 - STA. 104+415, DANGGO, TINOC, IFUGAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱37,278,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Tinoc River, Sta. 103 + 900 - Sta. 104 + 415, Danggo, Tinoc, Ifugao
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Ifugao 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

104 projects · ₱7.2B total · 3 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT

Cordillera Administrative Region, Cordillera Administrative Region

2022₱289.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BEYENG - TACADANG ROADBAKUN & KIBUNGAN, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2022₱198.0M
Reported complete (DPWH)
No sat.

KIANGAN - TINOC - BUGUIAS RD - KO355+520 - KO355+668TINOC, IFUGAO

Cordillera Administrative Region, Cordillera Administrative Region

2022₱193.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS GOV. BADO DANGWA NATIONAL ROADK0308+979 - KO309+08

Cordillera Administrative Region, Cordillera Administrative Region

2021₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD, ABINUAN - NATTUM - ALIMIT (MAYOYAO), BARANGAY BOLIWONG, LAGAWE, IFUGAO

Cordillera Administrative Region, Cordillera Administrative Region

2024₱191.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO

Cordillera Administrative Region, Cordillera Administrative Region

2025₱190.0M
Past target date (DPWH On-Going)
View all 104 projects →

4. Implementation

Contract Amount

₱36,188,771.07

Progress

Reported complete (DPWH)

Start Date

April 9, 2024

Target End

September 9, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)IfugaoTinocDanggo
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.