Barangay

Calafug

Calafug, Conner, Apayao, Cordillera Administrative Region (CAR). Rural. Population 1,035 (2024 POPCEN).

PSGC 1408102004 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Calafug

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

58 records · ₱919,608,819.17

  1. Construction of Flood Control Structure, Chico River Basin, Gangat Section, Sta. 39+001 - Sta. 40+076 (R/S), Barangay Calafug, Conner, Apayao₱95,016,104.77 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  2. Construction of Flood Control Structure, Chico River Basin, Gangat Section, Sta. 39+001 - Sta. 40+076 (L/S), Barangay Calafug, Conner, Apayao₱94,971,768.43 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  3. Construction of Flood Control Structure, Chico River Basin, Gangat Section, Sta. 40+076 - Sta. 41+151 (R/S), Barangay Calafug, Conner, Apayao₱94,932,370.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  4. Construction of Dpwh Building Apayao 1st District Engineering Office, Conner, Apayao₱56,163,208.34 · 2019 · medium confidence (project coordinates inside the barangay boundary)
  5. Basic Infrastructure Program(Bip)- Access Roads and/ Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities-Construction of Road, Brgy. Caglayan-Maubba to Makatel, Conner, Apayao₱49,500,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  6. Network Development- Construction of Missing Links/ New Roads- Abra-Kalinga-Apayao Road (Buluan-Banban-Puguin-Sacpil-Pinukpuk)₱48,999,000.00 · 2021 · medium confidence (project coordinates inside the barangay boundary)

How linked: 58 by project coordinates inside the barangay boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

1 record · ₱1,506,610.14

  1. Barangay Calafug - Conner, Apayao₱1,506,610.14 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Calafug itself. This shows the province figure for Apayao.

20,198 records · ₱50,099,975,750.06

20,170 placed at Apayao level itself; the rest in LGUs under it.

  1. Apayao₱50,099,975,750.06 · 20,170 awards · high confidence (area of delivery is this province only)
  2. Agusan del Norte, Agusan del Sur, Aklan, Albay, Antique, Apayao₱86,831,144.90 · 3 awards · low confidence (area of delivery lists several provinces)
  3. Apayao, Aurora₱3,225,541.00 · 1 awards · low confidence (area of delivery lists several provinces)
  4. Apayao, Aurora, Basilan, Bataan, Batanes, Batangas, Benguet, Biliran, Bohol, Bukidnon₱2,856,492.00 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Agusan del Norte, Agusan del Sur, Aklan, Albay, Antique, Apayao, Aurora, Basilan, Bataan, Batanes₱1,780,000.00 · 1 awards · low confidence (area of delivery lists several provinces)
  6. Antique, Apayao₱1,348,084.70 · 7 awards · low confidence (area of delivery lists several provinces)

How linked: 20,170 by area of delivery is this province only; 28 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Calafug itself. This shows the municipality figure for Conner.

6 records · ₱37,570,000.00

3 placed at Conner level itself; the rest in LGUs under it.

  1. Improvement of Farm-to-Market Road in Sitio Maligay Paddaoan, Conner, Apayao₱10,070,000.00 · 2024 · high confidence (location columns in the DBM release)
  2. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  3. Construction of Drainage Canal With Slope Protection Along Manag-Katablangan₱10,000,000.00 · 2022 · high confidence (location columns in the DBM release)
  4. Upgrading of Farm-to-Market Road at Barangay Allangigan₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  5. Upgrading of Farm-to-Market Road at Barangay Nabuangan₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  6. Upgrading of Farm-to-Market Road at Barangay Katablangan₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)

How linked: 6 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

5 records · ₱410,000,000.00

  1. Construction of Flood Control Structure, Chico River Basin, Caglayan Section, Sta. 37+926 - Sta. 39+239 (Left Side), Barangay Calafug, Conner, Apayao₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  2. Construction of Flood Control Structure, Chico River Basin, Gangat Section, Sta. 39+001 - Sta. 40+076 (L/S), Barangay Calafug, Conner, Apayao₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  3. Construction of Flood Control Structure, Chico River Basin, Gangat Section, Sta. 39 + 001 - Sta. 40+ 076 (R/S), Barangay Calafug, Conner, Apayao₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  4. Construction of Flood Control Structure, Chico River Basin, Gangat Section, Sta. 40+076 - Sta. 41+151 (R/S), Barangay Calafug, Conner, Apayao₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  5. Construction of Multi - Purpose Building ( Evacuation Center ) , Barangay Calafug, Conner, Apayao₱10,000,000.00 · 2024 · medium confidence (GAA line text names the place)

How linked: 5 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

See all 1 published flag

Contractors on linked DPWH projects

All 23 contractors on DPWH projects linked to Calafug and the LGUs under it. Click a column to sort.

Rodekom Gen Const And Ent3₱284,920,243.200
Celestino Const Development CORP Formerly: Jja Const2₱74,839,001.590
Pacific Star Erectors2₱66,049,686.470
Blessing Builders And Const Supply10₱62,363,475.410
Bahramley Const2₱60,851,919.410
Pbo Const CO3₱59,390,501.140
Prime Master Const And Dev'T CORP5₱47,095,564.501
Camia Const Development CORP Formerly:Cam2₱44,365,557.410
Gka Engineering And Const4₱31,973,288.330
Isnag Builders1₱31,083,515.000
Tribu Design2₱30,626,819.940
R B Alcazar Const CORP For:R B Alcazar Const1₱28,532,786.730
Colby Const1₱18,694,252.630
E C V Const2₱17,814,308.640
Jl22 Const2₱12,520,330.050
E B J R Const3₱10,059,002.400
Riil Const1₱7,124,395.300
Isaga Builders4₱6,997,365.570
Ec Structural Composites INC1₱6,860,000.000
Gvdpm Const CORP Formerly: Zm Constructio1₱5,758,053.350
Ay-Ca Const Supply1₱4,897,042.890
Cagayan Pacific Star Const CORP3₱4,747,044.330
Golden Gold Builder2₱2,044,664.880

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Calafug

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Calafug

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG