EDDMARI CONST & TRADING is listed as a company organization in Philippine public procurement records on this site, with 11 linked DPWH project(s) totaling about ₱801,908,045.41. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
EDDMARI CONST & TRADING
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 11
- Total value
- ₱801,908,045.41
- Published flags
- 3
- Region
- PAMPANGA · Region III
Online presence
Google Maps: Eddmari Construction and Trading★ 4 (17 reviews)Google Maps, 2026-10-22
Sto. Tomas, San Luis, Pampanga, 2QVQ+M7Q, San Luis, 2014 Pampanga
Licensed officers (PCAB)
- Edgardo A. Sagum · Authorized Managing Officer (PCAB license 20301) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for EDDMARI CONST & TRADING — not an accusation or finding of wrongdoing.
Score: 85.40 / 100 · Projects in sample: 11 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 11
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 11
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 11
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 11
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 94.5/100 · Weight: 11%
- projects
- 11
- componentScore
- 94.5
- flagsPerProject
- 0.18
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map · Download projects (CSV)
- Rehabilitation of Eroded Pampanga River Bank at Candating (Phase I), Arayat, Pampanga24CG0001 · ₱91,841,987.52 · mapped
- Construction of Flood Control Works Upstream Portion of Dalaquitan Bridge, Sto. Tomas, Pampanga23CG0146 · ₱91,674,954.68 · mapped
- Rehabilitation of Eroded Bank of Pampanga River at Candating, Arayat, Pampanga23CG0041 · ₱91,626,654.28 · mapped
- Contruction of Slope Protection along Pampanga River, Brgy. Cupang and Brgy. Guemasan, Arayat, Pampanga24CG0174 · ₱91,578,481.02 · mapped
- Rehabilitation of Eroded Pampanga River Bank at Candating (Phase II), Arayat, Pampanga24CG0026 · ₱91,485,522.95 · mapped
- Rehabilitation of River Channel and Slope Protection of Maasim River, Pulung Gubat Section, Candaba, Pampanga23CG0141 · ₱91,192,428.63 · mapped
- Construction of Revetment Wall (Pampanga Delta Development Project), Barangay Capalangan, Phase II, Apalit, Pampanga24CG0173 · ₱74,883,912.45 · mapped
- Construction of Slope Protection at Pampanga Delta Dikes along Left Bank, Consuelo (Phase I), Macabebe, Pampanga23CG0001 · ₱47,284,732.00 · mapped
- Construction of Slope Protection at Sapang Balen (Del Carmen-Bulaon Portion), City of San Fernando, Pampanga24CG0091 · ₱46,549,904.52 · mapped
- Construction of Slope Protection at Cabalantian-Mesalipit Road, Bacolor, Pampanga22CG0055 · ₱46,549,626.36 · mapped
- Construction of Drainage System at Cabalantian and San Vicente, Bacolor, Pampanga22CG0027 · ₱37,239,841.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 20301
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Dec 20, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 20301); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
20 evaluations listed across 8 GPPB CPES releases; average final rating 93.4% over 7 rated projects; 20 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 3, 2026 | NHA | ₱164,030,000.00 | Completed | 87.5% | 86.4% | 41st, p. 5 |
| Jun 25, 2025 | DPWH | ₱41,617,660.00 | Completed | 93.5% | 94.3% | 40th, p. 91 |
| Apr 29, 2025 | NHA | ₱37,010,000.00 | Completed | 99.3% | 99.3% | 40th, p. 91 |
| Apr 28, 2025 | DPWH | ₱30,548,480.00 | Completed | 98.9% | 94.3% | 40th, p. 91 |
| Mar 19, 2025 | NHA | ₱1,345,000.00 | On-going | 91.8% | — | 40th, p. 91 |
| Feb 18, 2025 | NHA | ₱164,063,000.00 | On-going | 78.6% | — | 40th, p. 91 |
| Feb 18, 2025 | DPWH | ₱41,617,660.00 | On-going | 94.8% | — | 39th (rev), p. 59 |
| Aug 21, 2024 | DPWH | ₱144,749,908.00 | On-going | 93.6% | — | 38th, p. 70 |
| Aug 12, 2024 | DPWH | ₱30,548,481.00 | On-going | 91.2% | — | 38th, p. 70 |
| Feb 12, 2024 | NHA | ₱164,063,000.00 | On-going | 93.2% | — | 39th (rev), p. 59 |
| Sep 8, 2023 | NHA | ₱1,157,540,000.00 | Completed | 95.0% | 97.0% | 37th, p. 33 |
| Jun 19, 2023 | NHA (JV) | ₱83,768,000.00 | Final | 64.4% | 84.4% | 36th, p. 63 |
Showing the 12 most recent of 20.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →