GO_SOLID BUILDERS INC is listed as a company organization in Philippine public procurement records on this site, with 20 linked DPWH project(s) totaling about ₱466,883,046.19. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GO_SOLID BUILDERS INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 20
- Total value
- ₱466,883,046.19
- Published flags
- 0
- Region
- Leyte 1st DEO · Region VIII
Public Record Grade
A transparent, data-derived summary of reported public records for GO_SOLID BUILDERS INC — not an accusation or finding of wrongdoing.
Score: 82.20 / 100 · Projects in sample: 20 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 78.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 78.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 16
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 19
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 20
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 20
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 20
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 20
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
19 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN JOSE, PALO, LEYTE25IC0017 · ₱77,186,083.75 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LIMBUHAN RIVER, TOLOSA, LEYTE25IC0027 · ₱77,177,676.50 · mapped
- Construction of Flood Control Structure along Busay River, Barangay District III, Babatngon, Leyte24IC0034 · ₱49,458,786.62 · mapped
- CONSTRUCTION OF ANONANG RIVER FLOOD CONTROL,BARANGAY ANONANG,BURAUEN,LEYTE20ID0039 · ₱29,693,897.99 · mapped
- Construction of Flood Control Structure Along Dungon River, Brgy. Rizal II, Babatngon, Leyte22IC0075 · ₱29,679,661.26 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BURAYAN RIVER, TACLOBAN CITY17IM0035 · ₱27,100,427.57
- OPENING/CONCRETING OF BRGY. PAGSULHUGON FMR, BRGY. PAGSULHUGON, BABATNGON, LEYTE23IC0137 · ₱24,837,973.47 · mapped
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF SLOPE PROTECTION STRUCTURE - CONST. OF SLOPE PROTECTION ALONG DUNGON RIVER, BRGY. RIZAL II SECTION, BABATNGON, LEYTE21IC0040 · ₱24,379,517.87 · mapped
- CONST. OF DRAINAGE STRUCTURE - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES, DRAINAGE SYSTEM AND SLOPE PROTECTION ALONG DUNGON RIVER, BRGY. VILLA MAGSAYSAY SECTION, BABATNGON, LEYTE21IC0039 · ₱24,379,454.78 · mapped
- CONCRETING OF BRGY. SAN ANTONIO FMR, BRGY. SAN ANTONIO, PALO, LEYTE20IC0094 · ₱15,857,524.72 · mapped
- CONCRETING OF BRGY. MAYA TO BRGY. SAN PEDRO FMR BRGY. MAYA AND BRGY. SAN PEDRO,MAC ARTHUR,LEYTE24ID0095 · ₱14,899,053.43 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, NEDA REGIONAL OFFICE 8, PALO, LEYTE23IC0087 · ₱14,675,000.00 · mapped
- CONSTRUCTION OF PALAPAY FLOOD CONTROL STRUCTURE ALONG PALAPAY RIVER, LEFT BANK SIDE, BRGY. POBLACION, LEYTE, LEYTELEYTE, LEYTE20IE0046 · ₱14,253,518.37 · mapped
- FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONST. OF FLOOD CONTROL ALONG DUNGON RIVER, BRGY. RIZAL II SECTION, BABATNGON, LEYTE20IC0054 · ₱9,362,701.59 · mapped
- FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONST. OF FLOOD CONTROL ALONG BAHAY RIVER, BRGY. GUINDAPUNAN SECTION, PALO, LEYTE20IC0055 · ₱9,324,304.85 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG DOMIRI RIVER,BRGY. CULASIAN,CAPOOCAN,LEYTE19ID0022 · ₱8,855,093.05 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE,BRGY. GUINDAPUNAN EAST,CARIGARA,LEYTE20ID0020 · ₱4,949,194.93 · mapped
- CONCRETING OF ROAD,BRGY. TIGBAO,CARIGARA,LEYTE20ID0013 · ₱4,939,106.53 · mapped
- CONST. OF ONE-STOREY, TWO-CLASSROOM SCHOOL BUILDING, (9.5MX18.0M) WITH PARAPET, BORSETH NATIONAL HIGH SCHOOL, ALANGALANG, LEYTE.18IC0107 · ₱3,934,843.59 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF HAMINDANGON FLOOD CONTROLVILLABA, LEYTE19IE0047 · ₱1,939,225.32 · mapped
Equipment & capacity
PCAB license
- License no.
- 38948
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Mar 27, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 38948); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 4 GPPB CPES releases; average final rating 93.0% over 2 rated projects; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 2, 2025 | DPWH | ₱77,186,084.00 | On-going | 91.2% | — | 40th, p. 125 |
| Nov 4, 2024 | DPWH (JV) | ₱98,919,330.00 | On-going | 95.2% | — | 39th (rev), p. 68 |
| Oct 12, 2024 | DPWH | ₱49,458,787.00 | Completed | 94.5% | 94.5% | 39th (rev), p. 81 |
| May 22, 2022 | NIA | ₱23,638,033.00 | On-going | 91.4% | — | 34th, p. 33 |
| Nov 12, 2019 | DPWH | ₱8,855,093.00 | Completed | 92.2% | 91.4% | 37th, p. 43 |
| Aug 27, 2019 | DPWH | ₱8,855,093.00 | On-going | 90.9% | — | 37th, p. 43 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →