HKBT CONST is listed as a company organization in Philippine public procurement records on this site, with 14 linked DPWH project(s) totaling about ₱166,716,157.43. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
HKBT CONST
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 14
- Total value
- ₱166,716,157.43
- Published flags
- 0
- Region
- Lower Kalinga DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- HARVY KAY BONGAT TOCYAPAO · Authorized Managing Officer (PCAB license 48936) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for HKBT CONST — not an accusation or finding of wrongdoing.
Score: 68.20 / 100 · Projects in sample: 14 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 46.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 46.7
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 12
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 78.6/100 · Weight: 24%
- totalProjects
- 14
- componentScore
- 78.6
- terminatedProjects
- 1
- terminationRatePct
- 7.1
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 14
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
14 geotagged projects — Open full map · Download projects (CSV)
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL ALONG CHICO RIV24PK0030 · ₱29,395,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY NEW TANGLAG (B/S),25PL0035 · ₱28,948,199.25 · mapped
- (1) RECONSTRUCTION OF THE BAMBOO FOOTBRIDGE AT SAMANG CREEK, SAKKI-ING FOOTBRIDGE AND KALIMANGOWAN FOOTBRIDGE, SITIO PAYAO, BRGY. LOWER UMA, LUBUAGAN, KALINGA(2) RECONSTRUCTION OF SUKLAP SUSPENSION FOOTBRIDGE, SUKLAP, BRGY. TANGLAG, LUBUAGAN KALINGA(321P00116 · ₱19,330,204.50 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALO25PL0036 · ₱19,298,958.69 · mapped
- Construction of Flood Control (liglig GIIPO) along Chico River, Sta. 169 + 650 - Sta. 169 + 950 (RS), Barangay Tanglag, Lubuagan, Kalinga23PK0006 · ₱16,609,960.78 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - WATER SUPPLY SYSTEM CONSTRUCTION OF WATER SYSTEM, BARANGAY COMMUNITY WATERWORKS IN OLATA, BARANGAY MABILONG22PK0066 · ₱14,689,410.23 · mapped
- Construction of Flood Control at Kabiggen, Sta. 180 + 690 - Sta. 180 + 850 (RS), Western Uma, Lubuagan, Kalinga23PK0034 · ₱9,794,194.36 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS ALONG LUBUAGAN - BATONG BUHAY - ABRA BOUNDARY ROAD, LUBUAGAN, K24PK0053 · ₱8,684,803.81 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG25PK0024 · ₱4,898,560.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANANIG RIVER AT CULLAYA25PL0049 · ₱4,894,834.64 · mapped
- Construction of Flood Control along Chico River, Sta. 174 + 270 - Sta. 174 + 350 (R.S.), Barangay Mabongtot, Lubuagan, Kalinga23PK0077 · ₱4,893,851.15 · mapped
- IMPROVEMENT OF RIVERSIDE/SITIO SUMADEL DRAINAGE CANAL SYSTEM, TABUK CITY, KALINGA21PL0069 · ₱1,974,573.90 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: TERTIARY ROADS ALONG LUBUAGAN - BATONG BUHAY - ABRA BOUNDARY ROAD, LUBUAGAN, KA22PK0031 · ₱1,654,304.18 · mapped
- CONSTRUCTION (COMPLETION) OF ISLA/MALLONG, /DUENAK/LAY-ASAN/EMPLOYEES VILLAGE FOOTBRIDGE W/ SLOPE PROTECTION, TABUK CITY/TANUDAN, KALINGA21PL0085 · ₱1,649,301.94 · mapped
Equipment & capacity
PCAB license
- License no.
- 48936
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Dec 22, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 48936); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
6 evaluations listed across 5 GPPB CPES releases; average final rating 89.3% over 2 rated projects; 6 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 1, 2025 | DPWH | ₱4,898,560.00 | On-going | 95.5% | — | 40th, p. 138 |
| Nov 30, 2024 | DPWH | ₱29,395,000.00 | On-going | 90.4% | — | 39th (rev), p. 89 |
| May 17, 2024 | DPWH | ₱16,609,961.00 | Completed | 99.6% | 91.5% | 38th, p. 101 |
| Sep 16, 2023 | DPWH | ₱16,609,961.00 | On-going | 80.3% | — | 36th, p. 93 |
| Jun 4, 2023 | DPWH | ₱16,609,961.00 | On-going | 92.0% | — | 36th, p. 93 |
| Mar 22, 2023 | DPWH | ₱14,689,410.00 | Completed | 85.5% | 87.1% | 35th, p. 75 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 14 awards · ₱167,302,369.91
- Province of Kalinga Infrastructure: 15 awards · ₱7,046,209.93
- Municipality of Balbalan, Kalinga Infrastructure: 4 awards · ₱3,960,681.57
- NIA Infrastructure: 2 awards · ₱3,296,120.58
- 25PK0024₱4,898,560.00· 2025-07-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- 25PL0035₱28,948,199.25· 2025-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 25PL0049₱4,894,834.64· 2025-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 25PL0036₱19,298,958.69· 2025-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 24PK0053₱8,684,803.81· 2024-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- PROPOSED CONSTRUCTION OF NATIONAL CDC, MALING
- 24PK0030₱29,395,000.00· 2024-04-11· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- CW-C-KATTU BARU SIP-01-2024₱2,828,962.10· 2024-02-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - KALINGA IRRIGATION MANA
- CW-C-TANGBAY CREEK GOBGOB PIS-01-2024₱467,158.48· 2024-02-26· Other construction· NATIONAL IRRIGATION ADMINISTRATION - KALINGA IRRIGATION MANA
- 23PK0077₱4,893,851.15· 2023-06-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- 23PK0034₱9,794,194.36· 2023-02-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- CONSTRUCTION OF HERITAGE PARK SOUTHERN E/S, PUROK
- 23PK0006₱16,609,960.78· 2023-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- UPGRADING/IMPROVEMENT OF SECURITY OFFICE CAPITOL
- REPAIR AND MAINTENANCE OF BUILDINGS AND OTHER
- IMPROVEMENT/UPGRADING OF ROAD BJMP P6, BULANAO
- 22PK0066₱14,689,410.23· 2022-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- 22PK0031₱1,654,304.18· 2022-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - UPPER KALINGA DEO
- 21PL0085₱2,641,755.56· 2022-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- CONSTRUCTION OF DRAINAGE CANAL NFA ROAD, BULANAO
- CONTINUATION OF FOOTSTEPS WITH DRAINAGE CANAL
- CONSTRUCTION OF FLOOD CONTROL DAMSITE
- IMPROVEMENT/UPGRADING OF ROAD PUROK 6, BULANAO
- INSTALLATION OF SOLAR POWERED STREETLIGHTS
- UPGRADING IMPROVEMENT OF PAYAO HANGING BRIDGE
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →