DGSARM BUILDERS INC FORMERLY: D G SARMENTA CONST is listed as a company organization in Philippine public procurement records on this site, with 145 linked DPWH project(s) totaling about ₱2,701,418,775.03. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
DGSARM BUILDERS INC FORMERLY: D G SARMENTA CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 145
- Total value
- ₱2,701,418,775.03
- Published flags
- 5
- Region
- Nueva Ecija 2nd DEO · Region III
Licensed officers (PCAB)
- Danilo G. Sarmenta · Authorized Managing Officer (PCAB license 13024) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for DGSARM BUILDERS INC FORMERLY: D G SARMENTA CONST — not an accusation or finding of wrongdoing.
Score: 95.40 / 100 · Projects in sample: 145 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 94.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 94.2
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 138
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 143
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 145
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 145
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.2/100 · Weight: 11%
- projects
- 145
- componentScore
- 99.2
- flagsPerProject
- 0.03
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 145
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 40 of 110 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Construction of Flood Mitigation Structure along Peñaranda River, Barangay Sto. Niño, Gapan City, Nueva Ecija23CF0059 · ₱96,499,920.00 · mapped
- Construction of Flood Control Structure along Peñaranda River, Barangay Santo Niño, Gapan City, Nueva Ecija24CF0025 · ₱96,499,860.47 · mapped
- Construction of Flood Mitigation Structure along Pampanga River, Barangay Ibabao Bana, Cabanatuan City, Nueva Ecija24CF0004 · ₱86,849,964.84 · mapped
- Construction of Flood Control Structure, Barangay Dalampang, Cabanatuan City, Nueva Ecija24CF0078 · ₱71,072,250.00 · mapped
- Construction of Flood Control Structures along Labong River, Brgy. Manacsac, Guimba, Nueva Ecija22CE0074 · ₱67,550,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, STA. 48+168 - STA. 48+483, BRGY. PASONG INCHIC, GUIMBA, NUEVA ECIJA21CE0115 · ₱66,198,432.71 · mapped
- ASSET PRESERVATION PROGRAM CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - NUEVA ECIJA-AURORA RD - K0119+192 - K0119+231, K0119+231 - K0119+858, K0119+862 - K0119+1004.50, K0120+000 - K0120+040, K0120+040 -24CF0018 · ₱61,339,187.10 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT TAMBONGON NATIONAL HIGHSCHOOL, PANTUKAN, DAVAO DE ORO24LA0049 · ₱49,009,504.62 · mapped
- Construction of Flood Control Structure along Labong River, Barangay Poblacion Sur, Licab, Nueva Ecija23CE0030 · ₱48,993,969.00 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, GUIMBA-TALUGTUG-UMINGAN RD-(S04415LZ) CHAINAGE 4597 - CHAINAGE 5279, CHAINAGE 7259 - CHAINAGE 756223CE0062 · ₱48,896,761.43 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER, BARANGAY MACAMIAS, GUIMBA, NUEVA ECIJA25CE0030 · ₱48,513,951.26 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - NUEVA ECIJA - AURORA RD. - K0118+564-K0119+82522CF0071 · ₱48,019,808.79 · mapped
- Construction of Flood Control Structure along Labong River, Barangay Caingin Tabing Ilog, Guimba, Nueva Ecija24CE0100 · ₱47,767,320.74 · mapped
- Construction of Flood Control Structure along Dibabuyan River, Barangay Mabini, Santo Domingo, Nueva Ecija24CE0259 · ₱47,767,129.00 · mapped
- CONSTRUCTION OF 8 CLASSROOMS WORKSHOP BUILDING, EXEQUIEL R. LINA NATIONAL HIGH SCHOOL, LICAB, NUEVA ECIJA17CE0306 · ₱47,188,199.49
- NETWORK DEVELOPMENT,OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE,STA. ROSA-FORT MAGSAYSAY ROAD,STA. ROSA,NUEVA ECIJA K0107+476.00-K0113+749.2216CF0005 · ₱45,594,830.23 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) BANGAD -FORT MAGSAYSAY ROAD,K0132+026.10-K0 117CF0063 · ₱42,655,267.69 · mapped
- NETWORK DEVELOPMENT,OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE,BANGAD-FORT MAGSAYSAY ROAD,CABANATUAN CITY NUEVA ECIJA K0124+825.10-K0129+405.3016CF0004 · ₱41,861,199.74 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, BRGY. STA. VERONICA, GUIMBA, NUEVA ECIJA20CE0015 · ₱40,969,787.45 · mapped
- CONSTRUCTION OF 3STY15CL, VICENTE R. BUMANLAG, SR. NATIONAL HS, ALIAGA, NUEVA ECIJA19CE0252 · ₱39,684,843.56 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LABONG RIVER, BRGY. SAN CRISTOBAL, LICAB, NUEVA ECIJA20CE0001 · ₱39,199,387.57 · mapped
- NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUIMBA-PURA ROAD, NUEVA ECIJA25CE0025 · ₱38,807,614.97 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION MUNICIPALITY OF LAUR, NUEVA ECIJA22CF0085 · ₱38,680,160.80 · mapped
- CONSTRUCTION OF EVACUATION CENTER, SITIO LOOBAN, BARANGAY TANYAG, CALINTAAN, OCCIDENTAL MINDORO20EB0131 · ₱34,411,835.43 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - NUEVA ECIJA - AURORA RD - K0138+121.40-K0138+144, K0138+460-K0139+94525CF0089 · ₱33,652,900.47 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, NUEVA ECIJA - PANGASINAN RD - K0152+000 - K0153+00024CE0281 · ₱33,292,100.53 · mapped
- CONSTRUCTION OF A 3STY6WS BUILDING, CESAR E. VERGARA MEMORIAL HIGH SCHOOL, CABANATUAN CITY, NUEVA ECIJA 3RD LD17CF0237 · ₱32,819,338.05
- CONSTRUCTION OF A 3STY6WS BUILDING, EASTERN CABU NHS, CABANATUAN CITY, NUEVA ECIJA 3RD LD17CF0235 · ₱32,819,338.05
- CONSTRUCTION OF 6 CLASSROOMS WORKSHOP BUILDING, STA. MARIA NATIONAL HIGH SCHOOL, LICAB, NUEVA ECIJA17CE0229 · ₱31,382,350.48
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTUR RIVER, BARANGAY BANTUG, GABALDON, NUEVA ECIJA25CF0038 · ₱29,819,560.58 · mapped
- CONSTRUCTION OF APARTMENT, 7ID, FORT MAGSAYSAY, PALAYAN CITY, NUEVA ECIJA21CF0192 · ₱28,882,102.62 · mapped
- CONSTRUCTION OF 2 UNITS 3 CLASSROOMS WORKSHOP BUILDING, CUYAPO NATIONAL HIGH SCHOOL, CUYAPO, NUEVA ECIJA17CE0222 · ₱28,451,581.93
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG TALAVERA RIVER, BRGY. MATIAS, TALAVERA, NUEVA ECIJA17CE0163 · ₱27,925,724.36 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER, BRGY. STA. MONICA, ALIAGA, NUEVA ECIJA17CE0158 · ₱27,924,885.13 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CABANATUAN CITY - CARMEN RD K0129+(-1003) - K0129+00023CE0015 · ₱27,439,868.58 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER BRGY. STA. MONICA, ALIAGA, NUEVA ECIJA, STA. 102+395.98 - STA. 102+533.67, STA. 103+206.99 - STA. 103+262.5017CE0083 · ₱26,684,055.38
- CONSTRUCTION OF A 4STY16CL SCHOOL BUILDING, MAYAPYAP NHS, CABANATUAN CITY, NUEVA ECIJA 3RD LD - CONSTRUCTION OF CLASSROOM16CF0163 · ₱26,105,881.30
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - TARLAC - GUIMBA RD VIA VICTORIA - K0148+-184 - K0149+300, K0151+000 - K0153+32917CE0317 · ₱25,079,332.16 · mapped
- CONSTRUCTION OF ENLISTED PERSONNEL BARRACKS, FORT RAMON MAGSAYSAY, PALAYAN CITY, NUEVA ECIJA22CF0076 · ₱24,006,453.37 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, NUEVA ECIJA-PANGASINAN RD - K0150 + 252 - K0150 + 400, K0150 + 500 - K0151 + 500, K0153 + 000 - K0153 + 20024CE0299 · ₱22,313,845.08 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, NUEVA ECIJA-PANGASINAN RD - K0141 + 184 - K0141 + 202, K0141 + 330 - K0141 + 348, K0141 + 600 - K0141 + 962, K0142 + 000 - K0142 + 044, K014225CE0234 · ₱22,305,763.91 · mapped
- CONSTRUCTION OF 2 2STY8CL SCHOOL BUILDINGS, MAGPAPALAYOK NHS, SAN LEONARDO, NUEVA ECIJA 4TH LD - CONSTRUCTION OF CLASSROOMS16CF0084 · ₱21,852,836.03
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - GAPAN - FORT MAGSAYSAY RD - K0094+460.30 - K0095+000, K0096+000 - K0096+604, K0111+614.90 - K0112+910.8022CF0044 · ₱21,394,951.37 · mapped
- CONSTRUCTION OF ROAD WITH DRAINAGE ALONG BRGY. STO. CRISTO, SAN ANTONIO, NUEVA ECIJA22CF0109 · ₱21,303,782.50 · mapped
- CONSTRUCTION OF 4 CLASSROOMS WORKSHOP BUILDING, TALAVERA NATIONAL HIGH SCHOOL, TALAVERA, NUEVA ECIJA17CE0238 · ₱20,812,789.52
- PREVENTIVE MAINTENANCE - PRIMARY ROADS, STA. ROSA - TARLAC RD. K0 109+000 - K0 109+726, K0110+1260 - K0 111+117.1521CF0087 · ₱20,605,412.01 · mapped
- CONCRETING OF BARANGAY LENNEC FMR, BARANGAY LENNEC, GUIMBA, NUEVA ECIJA22CE0179 · ₱19,900,000.00 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - NUEVA ECIJA - PANGASINAN RD - K0161+000 - K0162+000, K0163+000 - K0163+952, K0170+000 - K0171+00017CE0316 · ₱19,674,510.39 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, GABALDON, NUEVA ECIJA25CF0072 · ₱19,306,259.96 · mapped
- CONSTRUCTION OF A 3STY12CL SCHOOL BUILDING, TALABUTAB NORTE NHS, GENERAL MAMERTO NATIVIDAD, NUEVA ECIJA 3RD LD -CONSTRUCTION OF CLASSROOM16CF0172 · ₱19,289,128.86
Equipment & capacity
PCAB license
- License no.
- 13024
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- May 9, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 13024); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
7 evaluations listed across 4 GPPB CPES releases; average final rating 91.7% over 2 rated projects; 7 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 26, 2025 | DPWH | 49,009,504.620 (₱ thousands, as printed; flagged) | On-going | 94.1% | — | 40th, p. 78 |
| Apr 25, 2024 | DPWH (JV) | ₱143,301,860.00 | On-going | 87.6% | — | 38th, p. 129 |
| Mar 3, 2023 | DPWH | ₱38,680,161.00 | On-going | 85.3% | — | 35th, p. 42 |
| Mar 3, 2023 | DPWH | ₱48,019,809.00 | On-going | 89.4% | — | 35th, p. 42 |
| Oct 21, 2022 | DPWH | ₱67,550,000.00 | Completed | 95.7% | 96.5% | 35th, p. 42 |
| Jun 22, 2022 | DPWH | ₱67,550,000.00 | On-going | 97.0% | — | 34th, p. 22 |
| Jun 12, 2019 | DPWH | ₱11,840,375.00 | Completed | 87.0% | 87.0% | 40th, p. 74 |
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →