JFR CONST INC FORMERLY:JFR CONST is listed as a company organization in Philippine public procurement records on this site, with 307 linked DPWH project(s) totaling about ₱6,083,256,397.11. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
JFR CONST INC FORMERLY:JFR CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 307
- Total value
- ₱6,083,256,397.11
- Published flags
- 9
- Region
- Samar 1st DEO · Region VIII
Online presence
Google Maps: JFR Construction Office and MotorpoolGoogle Maps, 2026-10-22
QVFP+WJR, 1, Catbalogan City Proper, City of Catbalogan, Samar
Public Record Grade
A transparent, data-derived summary of reported public records for JFR CONST INC FORMERLY:JFR CONST — not an accusation or finding of wrongdoing.
Score: 88.10 / 100 · Projects in sample: 307 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 76.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 76.2
- lateCompletedProjects
- 22
- onTimeCompletedProjects
- 242
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 298
- pastTargetOngoingProjects
- 34
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 307
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 307
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.6/100 · Weight: 11%
- projects
- 307
- componentScore
- 99.6
- flagsPerProject
- 0.01
- publishedV2Flags
- 4
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 307
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 251 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF CATBALOGAN DRAINAGE SYSTEM (ANTIAO CREEK AND OUTFALLS), CATBALOGAN CITY, SAMAR23IK0073 · ₱101,324,347.19 · mapped
- CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR PHASE II, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE24IM0104 · ₱99,431,321.97 · mapped
- ASSET PRESERVATION-REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.), K0864+400 - K0864+510, BRGY. LAYGAYON, PINABACDAO, SAMAR23IK0050 · ₱96,498,395.80 · mapped
- CONST. OF FLOOD CONTROL BUCALAN BRIDGE, BARANGAY CANDUYOCAN, SAN SEBASTIAN, SAMAR24IK0033 · ₱96,414,360.49 · mapped
- CONSTRUCTION OF CATBALOGAN DRAINAGE SYSTEM, CATBALOGAN CITY, SAMAR24IK0041 · ₱95,438,397.65 · mapped
- Construction of Flood Control Structure along Pulid River, Calbayog City22IJ0082 · ₱93,928,535.96 · mapped
- OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG AIRPORT BY-PASS ROAD , SAMAR24IJ0014 · ₱88,194,522.89 · mapped
- CONSTRUCTION OF CONCEPTION - TAPUL - NAWI - PAGSANGHAN - ANAGASE - STO. NIÑO - MAYLOBE - SARAO CANVAIS - CARANAS ROAD, PARANAS - MOTIONG, SAMAR24IK0034 · ₱86,848,463.16 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT EASTERN VISAYAS REGIONAL SCIENCE HIGH SCHOOL BUILDING, GUINDAPUNAN, CATBALOGAN CITY23IK0077 · ₱77,512,499.45 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONST. OF DPWH SAMAR 2ND DEO NEW BUILDING, CATBALOGAN CITY,24IK0099 · ₱77,188,000.54 · mapped
- NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY ROADS- BASEY-MARABUT-PINAMITINAN RD- K0909+(-784.20)-K0910+000, BASEY, SAMAR25IK0009 · ₱77,111,483.61 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) - K0707+108 - K0707+808, K0734+137 - K0734+539, K0777+389 - K0778+000, K0781+240 - K0781+780,24I00243 · ₱76,477,094.63 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJ ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL RDS AND/OR BRIDGES (RDS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST OF ACCESS RD, LITERON ANTOL IN CALBIGA TO CANLOBO-LAYO-MAGDAWAT-PELAON OF PINABACDAO TO MABINI, BASEY, S25IK0016 · ₱72,365,073.88 · mapped
- OO1: (RE-ADVERTISD) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG AIRPORT BY-PASS ROAD, CALBAYOG CITY, SAMAR23IJ0013 · ₱69,983,651.13 · mapped
- OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, STA. MARGARITA, DIVERSION ROAD, SAMAR23IJ0071 · ₱69,131,884.07 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay Calirocan, Gandara, Samar24IJ0019 · ₱67,514,703.27 · mapped
- OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BARANGAY MADUROTO, MATUGUINAO, SAMAR25IJ0007 · ₱67,505,716.97 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0798+134 - K0798+38124IJ0022 · ₱67,494,083.71 · mapped
- CONSTRUCTION OF PHASE III OF THE NEW PROVINCIAL HOSPITAL PROJECT, CATBALOGAN CITY, SAMAR24IK0095 · ₱66,839,059.93 · mapped
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD CONTROL STRUCTURE, ANTIAO BRIDGE IV (CATBALOGAN DIVERSION BRIDGE), STA. 0+926.31-STA. 1+040.00, BRGY, SAN ANDRES, CATBALOGAN CITY, SAMAR25IK0051 · ₱62,714,460.17 · mapped
- CONSTRUCTION OF 4STY20CL, ANIBONG DREAMVILLE ELEMENTARY SCHOOL, TACLOBAN CITY, LEYTE23IM0119 · ₱59,967,479.46 · mapped
- NETWORK DEVELOPMENT- ROAD WIDENING-SECONDARY ROADS- WRIGHT-TAFT-BORONGAN RD.- K0834+037-K0835+000, PARANAS, SAMAR25IK0008 · ₱59,764,000.00 · mapped
- CONST. OF MULTI-PURPOSE BUILDING, CATBALOGAN CITY, SAMAR24IK0089 · ₱58,806,000.00 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay Casab-ahan (Phase II), Gandara, Samar23IJ0002 · ₱53,045,950.90 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay Hampton (Hampton Bridge), Gandara, Samar23IJ0021 · ₱52,879,569.42 · mapped
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD CONTROL STRUCTURE, BULACAN BRIDGE, STA. 0+000.00 - STA. 0+116.29, BRGY. CANDUYOCAN, SAN SEBASTIAN, SAMAR25IK0059 · ₱52,528,530.66 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, BASEY - MARABUT - PINAMITINAN RD., K0910+000 - K0910+470, K0910+494 - K0911+00025IK0004 · ₱52,485,611.00 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) K0782+342 - K0782+497, K0783+(-196) - K0783+(-130)23IJ0012 · ₱50,074,821.78 · mapped
- CSSP: CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING), GANDARA, SAMAR24IJ0075 · ₱49,242,600.00 · mapped
- Construction of Flood Control Protection works Structure, Golden Bridge, San Juanico Basey- Sohoton Road, Basey, Samar22IK0032 · ₱48,997,687.30 · mapped
- ASSET PRESERVATION-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS - BASEY-MARABUT-PINAMITINAN ROAD, K0912+193 -K0912+530; K0916+900 - K0917+000; K0917+500 - K0917+743, K0917+757 - K0917+800, K0918+400 - K0918+550, K0920+1360 - K0920+142022IK0059 · ₱48,993,375.41 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD, K0918+000 - K0920+000, BABATNGON, LEYTE24IC0149 · ₱48,975,037.32 · mapped
- CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORKS UPSTREAM OF DAPDAP II DAM, BINAHAAN NORTH RIS (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN), ALANGALANG, LEYTE25IC0006 · ₱48,972,105.00 · mapped
- CSSP: CONSTRUCTION OF ROAD, GANDARA - MATUGUINAO, SAMAR23IJ0067 · ₱48,952,777.09 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay Bulao, San Jorge, Samar24IJ0062 · ₱48,947,871.30 · mapped
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, PAWING-CAMPETIC ROAD, K0917+(-297) - K0917+173, K0917+418 - K0917+986, PALO, LEYTE23IC0012 · ₱48,944,365.34 · mapped
- Construction of Flood Control Structure along Barruz River, Brgy. Barruz, Matuguinao, Samar22IJ0051 · ₱48,876,644.33 · mapped
- OO1: REHABILITATION/RECOGNITION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) KO725+(-285) - KO725+00022IJ0067 · ₱48,724,242.71 · mapped
- Construction of Flood Control Structure along Kinawan River (Upstream), Brgy. San Joaquin, Calbayog City, Samar22IJ0031 · ₱48,698,693.64 · mapped
- CONSTRUCTION OF ROAD, BRGY.JASMINEZ - BRGY. BALUD, GANDARA, SAMAR21IJ0124 · ₱48,670,000.00 · mapped
- Construction of Flood Control Structures along Tabawan Creek (Phase II), Brgy. Tabawan, Calbayog City, Samar22IJ0043 · ₱48,637,574.32 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER, BARANGAY BANGAHON, GANDARA, SAMAR22IJ0013 · ₱48,569,698.50 · mapped
- REHABILITATION OF CALBAYOG DIVERSION ROAD TO PIDO EXTENSION, BRGY. RIZAL I TO BRGY. EAST AWANG, CALBAYOG CITY, SAMAR21IJ0122 · ₱48,531,927.44 · mapped
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL ALONG BUSAY RIVER, BRGY. DIST. 3 SECTION, BABATNGON, LEYTE21IC0027 · ₱48,501,351.51 · mapped
- CONSTRUCTION OF ROAD, BONGA - PAMAMAS-AN - LINONOBAN - MARARANGSI - CALUYAHAN, MOTIONG, SAMAR23IK0036 · ₱48,249,297.22 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAGUNDI, CATBALOGAN CITY, SAMAR (PHASE I)23IK0078 · ₱48,230,350.12 · mapped
- Construction of Flood Control Structure, Brgy. Macatingog, Calbayog City, Samar22IJ0047 · ₱48,132,095.02 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARUGO II CENTRAL SCHOOL, BARUGO, LEYT23I00169 · ₱47,949,931.50 · mapped
- CONSTRUCTION OF STA. RITA SRIP PROTECTION WORKS, STA. RITA, SAMAR24IK0051 · ₱47,237,574.86 · mapped
- (RE-ADVERTISE) OO1: REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS (CALBAYOG-CATARMAN RD) KO792+566-KO792+632, KO793+(-096) -KO793+00022IJ0063 · ₱46,524,467.51 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
