CONST./MAINT. OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL ALONG BUSAY RIVER, BRGY. DIST. 3 SECTION, BABATNGON, LEYTE
CONST./MAINT. OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL ALONG BUSAY RIVER, BRGY. DIST. 3 SECTION, BABATNGON, LEYTE is a DPWH-tracked public work in Leyte 1st DEO, Region VIII. Reported contract value: ₱48,501,351.51. Status: Reported complete (DPWH). Contractor on record: JFR CONST INC FORMERLY:JFR CONST. Figures trace to dpwh.
Total Contract Cost


