Flood Control and Drainage21IC0027

CONST./MAINT. OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL ALONG BUSAY RIVER, BRGY. DIST. 3 SECTION, BABATNGON, LEYTE

CONST./MAINT. OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL ALONG BUSAY RIVER, BRGY. DIST. 3 SECTION, BABATNGON, LEYTE is a DPWH-tracked public work in Leyte 1st DEO, Region VIII. Reported contract value: ₱48,501,351.51. Status: Reported complete (DPWH). Contractor on record: JFR CONST INC FORMERLY:JFR CONST. Figures trace to dpwh.

Leyte 1st DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21IC0027 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-08-09 → 2014-08-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Leyte

Based on the coordinates published with the DPWH record and NOAH file Leyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./MAINT. OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL ALONG BUSAY RIVER, BRGY. DIST. 3 SECTION, BABATNGON, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Busay River, Barangay Dist. 3 Section, Babatngon, Leyte
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Leyte 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

307 projects · ₱6.1B total · 9 flags

4. Implementation

Contract Amount

₱48,501,351.51

Progress

Reported complete (DPWH)

Start Date

March 2, 2021

Target End

November 7, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteBabatngonPoblacion District III
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.