SPECO BUILDERS INC FORMERLY VRF CONST is listed as a company organization in Philippine public procurement records on this site, with 131 linked DPWH project(s) totaling about ₱6,192,457,564.88. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
SPECO BUILDERS INC FORMERLY VRF CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 131
- Total value
- ₱6,192,457,564.88
- Published flags
- 3
- Region
- Nueva Ecija 1st DEO · Region III
Online presence
Google Maps: Speco Builders Inc.★ 3 (2 reviews)Google Maps, 2026-10-22
757 Narra Street, Mampulog, Bitas Bridge, Cabanatuan City, Nueva Ecija
Licensed officers (PCAB)
- VIC ROEL CRUZ FERRER · Authorized Managing Officer (PCAB license 15301) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SPECO BUILDERS INC FORMERLY VRF CONST — not an accusation or finding of wrongdoing.
Score: 88.70 / 100 · Projects in sample: 131 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.3/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 80.3
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 114
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 128
- pastTargetOngoingProjects
- 14
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 97.7/100 · Weight: 21%
- totalProjects
- 131
- componentScore
- 97.7
- terminatedProjects
- 1
- terminationRatePct
- 0.8
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 131
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 131
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 131
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 127 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF ROAD, INCLUDING BRIDGE, SAN AGUSTIN, STO. DOMINGO TO PAG-ASA, TALAVERA, NUEVA ECIJA21CE0131 · ₱234,494,701.38 · mapped
- CONSTRUCTION OF ROAD, INCLUDING BRIDGE, DOLORES, STO. DOMINGO TO SAN CARLOS, ALIAGA, NUEVA ECIJA21CE0132 · ₱233,529,546.54 · mapped
- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LZ), PROVINCE OF NUEVA ECIJA24C00028 · ₱145,330,874.46 · mapped
- BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-DIGDIG BRIDGE (BO0121LZ) ALONG MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA25C00238 · ₱121,190,399.82 · mapped
- CONSTRUCTION OF DE LEON DAM, BARANGAY BULAC, TALAVERA, NUEVA ECIJA25CE0148 · ₱116,407,423.31 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY CAVITE TO BARANGAY STA. ANA, GUIMBA, NUEVA ECIJA24CE0362 · ₱104,434,473.10 · mapped
- Construction of Flood Control Structures Along Pampanga River, Brgy. Poblacion Norte, Rizal, Nueva Ecija23CE0117 · ₱98,996,644.29 · mapped
- Construction of Flood Control Structures Along Dibolo Creek, Brgy. Del Pilar, Rizal, Nueva Ecija23CE0124 · ₱98,993,408.99 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA25C00488 · ₱96,760,507.56 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, GUIMBA - TALUGTUG - UMINGAN RD K0156+000 - K0159+00024CE0142 · ₱96,494,884.53 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, TARLAC - GUIMBA RD K0148+200 - K0151+00024CE0143 · ₱96,491,680.64 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT PINAGPANAAN - RIZAL - PANTABANGAN RD - K0126+000 - K0127+644, K0130+000 - K0131+10024CE0171 · ₱96,489,619.01 · mapped
- RECONSTRUCTION/REHABILITATION/UPGRADING OF STA. LUCIA OLD ROAD, ZARAGOZA, NUEVA ECIJA18CE0107 · ₱96,000,260.86 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS, STA ROSA - TARLAC RD - K0118+(-275) - K0118+(-107), K0123+720 - K0124+000, K0124+000 - K0126+00024CE0155 · ₱95,904,048.82 · mapped
- WIDENING OF PERMANENT BRIDGES - ILOG BALIWAG BR. (B01275LZ) ALONG NUEVA ECIJA-PANGASINAN RD25CE0231 · ₱95,527,479.65 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL DIKES, PHASE II, BRGY. VILLAROSA, STA. 6+794.70-STA. 7+582.7, LICAB, NUEVA ECIJA16CE0311 · ₱93,059,907.47 · mapped
- CONST/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/REPAIR/REHABILITATION OF FLOOD CONTROL DIKES, PHASE I, BRGY. VILLAROSA, LICAB, NUEVA ECIJA16CE0062 · ₱92,902,832.04
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - NUEVA ECIJA - PANGASINAN RD K0150+300 - K0151+000, K0159+000 - K0159+368, K0159+785 - K0160+000, K0140+000 - K0142+382, K0151+000 - K0151+46019CE0007 · ₱91,667,093.19 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ROQUE - BACAYAO ROAD, GUIMBA BY-PASS (PACKAGE 2), NUEVA ECIJA19CE0190 · ₱90,962,057.54 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, NUEVA ECIJA - PANGASINAN RD - K0153+000 - K0154+914, K0158+000 - K0159+00024CE0156 · ₱88,775,164.70 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ALIAGA - GUIMBA DIVERSION ROAD, NUEVA ECIJA22CE0070 · ₱88,514,517.09 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CABANATUAN CITY - CARMEN RD - K0129+775 - K0130+508, K0131+000 - K0131+050, K0132+000 - K0133+000, K0133+750 - K0133+980, K0136+000 - K0136+350,24CE0213 · ₱87,813,289.89 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SAN ROQUE - BACAYAO ROAD, GUIMBA BY-PASS, PACKAGE 1, NUEVA ECIJA20CE0057 · ₱86,492,442.06 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TALAVERA-LICAB DIVERSION ROAD, NUEVA ECIJA20CE0238 · ₱86,163,246.16 · mapped
- ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST/UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT.-4 (HDM-4) SECONDARY ROAD, NUEVA ECIJA-PANGASINAN ROAD, NE 1ST. L.D.15C00088 · ₱84,426,746.82 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD - K0138+000 - K0140+000, K0160+584 - K0161+549, K0162+000 - K0163+00024CE0099 · ₱84,421,231.22 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY BALBALINO, GUIMBA, NUEVA ECIJA24CE0363 · ₱83,723,839.44 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT PINAGPANAAN-RIZAL-PANTABANGAN RD K0143+571 - K0146+000, K0148+013 - K0149+000, K0154+000 - K0155+080, K0172+000 - K0173+00020CE0081 · ₱79,225,101.76 · mapped
- ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST/UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCL. DRAINAGE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT.-4 (HDM4) SECONDARY ROADS, NUEVA ECIJA-PANGASINAN ROAD, N.E. 1ST LEGISLATIVE DIST. PROV. OF N.E.17C00012 · ₱76,466,394.79 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG LABONG RIVER, BRGY. VILLAROSA, (PHASE 4), LICAB, NUEVA ECIJA19CE0127 · ₱75,356,494.21 · mapped
- REHABILITATION/IMPROVEMENT OF TALAVERA RIVER CONTROL, BRGY. SIBUT, SAN JOSE CITY, NUEVA ECIJA19CE0136 · ₱72,661,605.00 · mapped
- CONSTRUCTION OF BRIDGE, BRGY. SAN JOSE, LICAB, NUEVA ECIJA23CE0073 · ₱72,374,897.78 · mapped
- Construction/Rehabilitation of Flood Control Structures along Talavera River, Brgy. Pag-asa, Talavera, Nueva Ecija24CE0168 · ₱71,651,197.07 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA25C00236 · ₱69,942,948.48 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0184+950 - K0185+15022CE0112 · ₱65,405,400.00 · mapped
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG PAMPANGA RIVER, BRGY. SAN GREGORIO, RIZAL, NUEVA ECIJA17CE0154 · ₱65,093,159.40 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES, BARACBAC BR. (B01303LZ) ALONG JCT PINAGPANAAN-RIZAL-PANTABANGAN RD25CE0069 · ₱62,088,272.35 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - BICOS BR. 1 (B01298LZ) ALONG JCT PINAGPANAAN-RIZAL-PANTABANGAN RD23CE0020 · ₱58,848,669.91 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LICAB - VICTORIA ROAD (BULAKID BRIDGE), NUEVA ECIJA24CE0053 · ₱57,888,277.72 · mapped
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG BANCO RIVER, SAN ESTEBAN, RIZAL, NUEVA ECIJA17CE0155 · ₱55,797,662.18 · mapped
- BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-CABITBITNUGAN BRIDGE (BO1967LZ) ALONG DAANG MAHARLIKA (LZ), PROVINCE OF NUEVA ECIJA24C00355 · ₱53,398,795.99 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY COMITANG, STO. DOMINGO TO BARANGAY CULONG, GUIMBA, NUEVA ECIJA25CE0147 · ₱49,467,418.29 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BRGY. SIBUT, SAN JOSE CITY, NUEVA ECIJA22CE0031 · ₱48,999,647.16 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PAMPANGA RIVER, BRGY. POBLACION NORTE, RIZAL, NUEVA ECIJA21CE0154 · ₱48,992,402.24 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER, STA. 56+891 - STA. 57+192, BRGY. SIBUT, SAN JOSE CITY, NUEVA ECIJA21CE0147 · ₱48,990,120.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PAMPANGA RIVER, BRGY. SAN GREGORIO, RIZAL, NUEVA ECIJA21CE0138 · ₱48,985,058.90 · mapped
- CONSTRUCTION OF BRIDGE, BRGY. SAN JOSE, LICAB, NUEVA ECIJA22CE0082 · ₱48,974,586.28 · mapped
- CONSTRUCTION OF BRIDGE, BRGY. BACAYAO, GUIMBA, NUEVA ECIJA22CE0107 · ₱48,924,494.21 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY COMITANG, STO DOMINGO TO BARANGAY CULONG, GUIMBA, NUEVA ECIJA24CE0280 · ₱48,505,096.90 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY CAANINAPLAHAN TO PANTOC BULAC BRIDGE, TALAVERA, NUEVA ECIJA24CE0279 · ₱48,501,830.27 · mapped
Equipment & capacity
PCAB license
- License no.
- 15301
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Aug 28, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 15301); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 4 GPPB CPES releases; average final rating 95.0% over 6 rated projects; 9 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱87,813,289.00 | Completed | 98.6% | 96.8% | 40th, p. 288 |
| Feb 18, 2025 | DPWH | ₱57,888,277.00 | Completed | 99.5% | 96.7% | 40th, p. 287 |
| Nov 28, 2024 | DPWH | ₱96,494,885.00 | Completed | 85.1% | 90.9% | 39th (rev), p. 199 |
| Oct 19, 2024 | DPWH | ₱87,813,289.00 | On-going | 95.6% | — | 39th (rev), p. 199 |
| Jan 7, 2023 | DPWH | ₱48,974,586.00 | Completed | 98.7% | 98.7% | 35th, p. 161 |
| Oct 21, 2022 | DPWH | ₱65,405,400.00 | Completed | 97.3% | 96.0% | 35th, p. 161 |
| Jun 22, 2022 | DPWH | ₱65,405,420.00 | On-going | 95.1% | — | 34th, p. 81 |
| Nov 26, 2019 | DPWH | ₱94,948,743.00 | On-going | 91.3% | — | 40th, p. 288 |
| Jun 13, 2019 | DPWH | ₱42,528,030.00 | Completed | 91.2% | 91.2% | 40th, p. 288 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →